A hybrid metaheuristic algorithm for resource-constrained proactive project scheduling with uncertainty-handling effort

被引:4
|
作者
Cui, Xiao [1 ]
He, Zhengwen [1 ]
Wang, Nengmin [1 ]
Zheng, Weibo [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Optimization model; Variable neighborhood search; Tabu search; Uncertainty-handling effort; TRADE-OFF; TABU SEARCH; ROBUST OPTIMIZATION; HEURISTIC PROCEDURES; MULTIMODE; CLASSIFICATION; MANAGEMENT; STABILITY; MAKESPAN; MINIMIZE;
D O I
10.1016/j.cie.2023.109741
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a resource-constrained proactive project scheduling problem, where activity durations are stochastic variables and uncertainty-handling effort is devoted to decreasing the standard deviation of activity duration. The task is to determine the optimal level of uncertainty-handling effort and the corresponding baseline schedule under the constraints of renewable resources and project deadline, minimizing the total cost which consists of the uncertainty-handling cost and the robustness and adjustment costs of the baseline schedule. Based on the problem formulation, an optimization model is constructed, in which there exist two kinds of trade-off relationships among related costs. Then, for the NP-hardness of the problem, a hybrid metaheuristic algorithm is designed by combining a variable neighborhood search with a tabu search. In light of the characteristics of the problem, four measures are proposed to improve the searching efficiency of the algorithm. Finally, an extensive computational experiment is conducted on a randomly generated dataset. Based on the obtained results, the algorithm and improvement measures are evaluated, and a sensitivity analysis of the effect of key parameters on the objective function value is also carried out. The research conclusions are as follows: the algorithm equipped with all the improvement measures is the most promising algorithm for the studied problem, and the key parameters may generate an effect on the costs relevant to uncertainty.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    Lambrechts, Olivier
    Demeulemeester, Erik
    Herroelen, Willy
    JOURNAL OF SCHEDULING, 2008, 11 (02) : 121 - 136
  • [22] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    Olivier Lambrechts
    Erik Demeulemeester
    Willy Herroelen
    Journal of Scheduling, 2008, 11 : 121 - 136
  • [23] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    Dai, T
    Kim, K
    Yokota, T
    Gen, M
    Proceedings of the Second International Conference on Information and Management Sciences, 2002, 2 : 440 - 440
  • [24] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Fikri Kucuksayacigil
    Gündüz Ulusoy
    Frontiers of Engineering Management, 2020, 7 : 426 - 446
  • [25] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Kucuksayacigil, Fikri
    Ulusoy, Gunduz
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 426 - 446
  • [26] A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 2451 - 2460
  • [27] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    Kim, KW
    Yun, YS
    Yoon, JM
    Gen, M
    Yamazaki, G
    COMPUTERS IN INDUSTRY, 2005, 56 (02) : 143 - 160
  • [28] A HYBRID GENETIC ALGORITHM FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH STOCHASTIC OVERLAPPING MODES
    Xie, Fang
    Yu, Jing
    Xu, Zhe
    ICIM2014: PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2014, : 286 - 289
  • [29] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [30] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114