A hybrid metaheuristic algorithm for resource-constrained proactive project scheduling with uncertainty-handling effort

被引:4
|
作者
Cui, Xiao [1 ]
He, Zhengwen [1 ]
Wang, Nengmin [1 ]
Zheng, Weibo [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Optimization model; Variable neighborhood search; Tabu search; Uncertainty-handling effort; TRADE-OFF; TABU SEARCH; ROBUST OPTIMIZATION; HEURISTIC PROCEDURES; MULTIMODE; CLASSIFICATION; MANAGEMENT; STABILITY; MAKESPAN; MINIMIZE;
D O I
10.1016/j.cie.2023.109741
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a resource-constrained proactive project scheduling problem, where activity durations are stochastic variables and uncertainty-handling effort is devoted to decreasing the standard deviation of activity duration. The task is to determine the optimal level of uncertainty-handling effort and the corresponding baseline schedule under the constraints of renewable resources and project deadline, minimizing the total cost which consists of the uncertainty-handling cost and the robustness and adjustment costs of the baseline schedule. Based on the problem formulation, an optimization model is constructed, in which there exist two kinds of trade-off relationships among related costs. Then, for the NP-hardness of the problem, a hybrid metaheuristic algorithm is designed by combining a variable neighborhood search with a tabu search. In light of the characteristics of the problem, four measures are proposed to improve the searching efficiency of the algorithm. Finally, an extensive computational experiment is conducted on a randomly generated dataset. Based on the obtained results, the algorithm and improvement measures are evaluated, and a sensitivity analysis of the effect of key parameters on the objective function value is also carried out. The research conclusions are as follows: the algorithm equipped with all the improvement measures is the most promising algorithm for the studied problem, and the key parameters may generate an effect on the costs relevant to uncertainty.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [2] A hybrid metaheuristic for resource-constrained project scheduling with, flexible resource profiles
    Tritschler, Martin
    Naber, Anulark
    Kolisch, Rainer
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (01) : 262 - 273
  • [3] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [4] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [5] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    Artificial Life and Robotics, 2012, 17 (02) : 312 - 316
  • [6] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [7] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [8] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Journal of Scheduling, 2019, 22 : 211 - 237
  • [9] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237
  • [10] A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    Yang, Zhen
    Demeulemeester, Erik
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2019, 66 (03) : 459 - 474