An aircraft final assembly line balancing problem considering resource constraints and parallel task scheduling

被引:7
|
作者
Bao, Zhongkai [1 ]
Chen, Lu [1 ]
Qiu, Kejun [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, 800 Dongchuan Rd, Shanghai 201100, Peoples R China
基金
中国国家自然科学基金;
关键词
Aircraft final assembly line; Assembly line balancing problem; Resource constraints; Construction and improvement heuristic; approach; Priority rule; GENETIC ALGORITHM; INVESTMENT;
D O I
10.1016/j.cie.2023.109436
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this study, the balancing problem of an aircraft final assembly line (AFAL) is investigated. The decision is to assign all the assembly tasks to a given number of workstations, with the objectives to balance the workstation cycle time and to minimize the total resource investment cost. An integer linear programming model is developed to formulate the problem. A construction and improvement based two-stage heuristic approach is proposed to solve this problem. In the first stage, an initial task assignment is constructed based on rules that are evolved by a multi-dimensional archive of phenotypic elites algorithm. In the second stage, an improvement heuristic, consisting of several customized neighborhood operators, is developed to improve the initial task assignment. The proposed approach is compared with the existing methods and its variants. Computational experiments and a real case study reveal the superiority of our proposed approach.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] STUDY ON AIRCRAFT ASSEMBLY LINE BALANCING PROBLEM BASED ON MOBILE WORKERS
    Zhang, Jie
    Xin, Bo
    Wang, Pan
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2016, VOL 4, 2016,
  • [32] Aircraft final assembly line scheduling with user preferences and equity of work distribution
    Lovato, D.
    Guillaume, R.
    Thierry, C.
    Battaia, O.
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024,
  • [33] Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints
    Andreu-Casas, Enric
    Garcia-Villoria, Alberto
    Pastor, Rafael
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (01) : 96 - 116
  • [34] Existence of feasible solution of multiple constraints assembly line balancing problem
    Zheng Q.
    Li M.
    Tang Q.
    Qi X.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (03): : 619 - 628
  • [35] USING METAHEURISTIC ALGORITHMS FOR SOLVING A MIXED MODEL ASSEMBLY LINE BALANCING PROBLEM CONSIDERING EXPRESS PARALLEL LINE AND LEARNING EFFECT
    Rabbani, Masoud
    Alipour, Farahnaz
    Farrokhi-Asl, Hamed
    Manavizadeh, Neda
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2018, 15 (02): : 254 - 269
  • [36] The robotic assembly line balancing problem under task time uncertainty
    Zacharia, Paraskevi
    Nearchou, Andreas C.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2025, : 2991 - 3011
  • [37] Evolution Balancing of Mixed Model-Assembly Line Considering Task Reassignment
    Wu, Y. M.
    Dai, L. Zh.
    Luo, L. F.
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2018, 17 (01) : 3 - 21
  • [38] Type-1 assembly line balancing considering uncertain task time
    Li, Yuchen
    Wen, Meilin
    Kang, Rui
    Yang, Zaoli
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (02) : 2619 - 2631
  • [39] Heuristics for a Distributed Parallel Machine Assembly Scheduling Problem with Eligibility Constraints
    Hatami, Sara
    Ruiz, Ruben
    Andres-Romano, Carlos
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 145 - 153
  • [40] Unrelated Parallel Machine Photolithography Scheduling Problem With Dual Resource Constraints
    Chen, Haichao
    Guo, Peng
    Jimenez, Jesus
    Dong, Zhijie Sasha
    Cheng, Wenming
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2023, 36 (01) : 100 - 112