Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints

被引:12
|
作者
Andreu-Casas, Enric [1 ]
Garcia-Villoria, Alberto [1 ]
Pastor, Rafael [1 ]
机构
[1] Univ Politecn Catalunya UPC, Inst Ind & Control Engn IOC, Ave Diagonal 647 Bldg ETSEIB,11th floor, Barcelona 08028, Spain
关键词
combinatorial optimization; Assembly line balancing; Multi-manned workstations; Dependent task times; Ad-hoc heuristic; Relax-and-Fix; MATHEMATICAL-MODEL; ALGORITHM; DESIGN; FORMULATION; WORKERS;
D O I
10.1016/j.ejor.2021.12.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper aims to study a variant of the multi-manned assembly line balancing problem (MALBP), which considers the possibility of multiple workers simultaneously performing different tasks at the same workstation. In most cases it is assumed that task times are deterministic. This paper takes into account possible interferences between workers and deals with the MALBP with task times depending on the number of workers at the station. Different procedures are developed: resolutions on the basis of a mathematical model, two Relax-and-Fix procedures, a heuristic based on solving a partition problem with constraints (named "HEUR_PART") and a set of other variants of the HEUR_PART procedure. The computational experiments indicate that HEUR_PART and the HEUR_PART_SGL variant are the proposals that perform best. Additionally, we show that they obtain better results than the ones published in the literature. (c) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页码:96 / 116
页数:21
相关论文
共 50 条
  • [1] New empirically adjusted heuristics for solving the multi-manned assembly line balancing problem with dependent task times
    Casas, Enric Andreu
    Garcia-Villoria, Alberto
    Pastor-Moreno, Rafael
    DYNA, 2024, 99 (02):
  • [2] A Hybrid Heuristic Algorithm for Multi-manned Assembly Line Balancing Problem with Location Constraints
    Krenczyk, Damian
    Dziki, Karol
    14TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS (SOCO 2019), 2020, 950 : 333 - 343
  • [3] A Multi-Manned Assembly Line Worker Assignment and Balancing Problem With Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Lee, Sang Hyun
    Lee, Seung Gi
    Kim, Hyung Rok
    Kim, Hyun-Jung
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (03) : 7786 - 7793
  • [4] The multi-manned joint assembly line balancing and feeding problem
    Zangaro, Francesco
    Minner, Stefan
    Battini, Daria
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (16) : 5543 - 5565
  • [5] A simulated annealing algorithm for multi-manned assembly line balancing problem
    Roshani, Abdolreza
    Roshani, Arezoo
    Roshani, Abdolhassan
    Salehi, Mohsen
    Esfandyari, Azadeh
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 238 - 247
  • [6] Multi-manned assembly line balancing problem with balanced load density
    Yilmaz, Hamid
    Yilmaz, Mustafa
    ASSEMBLY AUTOMATION, 2015, 35 (01) : 137 - 142
  • [7] An artificial immune system algorithm for solving the stochastic multi-manned assembly line balancing problem
    Zakaraia M.
    Zaher H.
    Ragaa N.
    International Journal of Industrial and Systems Engineering, 2023, 45 (01) : 68 - 88
  • [8] Constraint programming model for multi-manned assembly line balancing problem
    Cil, Zeynel Abidin
    Kizilay, Damla
    COMPUTERS & OPERATIONS RESEARCH, 2020, 124
  • [9] An exact constraint programming based procedure for the multi-manned assembly line balancing problem
    Junior, Moacyr Carlos
    Michels, Adalberto Sato
    Magatao, Leandro
    COMPUTERS & OPERATIONS RESEARCH, 2024, 162 (162)
  • [10] Flexible multi-manned assembly line balancing problem: Model, heuristic procedure, and lower bounds for line length minimization
    Lopes, Thiago Cantos
    Pastre, Giuliano Vidal
    Michels, Adalberto Sato
    Magatao, Leandro
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 95