Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints

被引:12
|
作者
Andreu-Casas, Enric [1 ]
Garcia-Villoria, Alberto [1 ]
Pastor, Rafael [1 ]
机构
[1] Univ Politecn Catalunya UPC, Inst Ind & Control Engn IOC, Ave Diagonal 647 Bldg ETSEIB,11th floor, Barcelona 08028, Spain
关键词
combinatorial optimization; Assembly line balancing; Multi-manned workstations; Dependent task times; Ad-hoc heuristic; Relax-and-Fix; MATHEMATICAL-MODEL; ALGORITHM; DESIGN; FORMULATION; WORKERS;
D O I
10.1016/j.ejor.2021.12.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper aims to study a variant of the multi-manned assembly line balancing problem (MALBP), which considers the possibility of multiple workers simultaneously performing different tasks at the same workstation. In most cases it is assumed that task times are deterministic. This paper takes into account possible interferences between workers and deals with the MALBP with task times depending on the number of workers at the station. Different procedures are developed: resolutions on the basis of a mathematical model, two Relax-and-Fix procedures, a heuristic based on solving a partition problem with constraints (named "HEUR_PART") and a set of other variants of the HEUR_PART procedure. The computational experiments indicate that HEUR_PART and the HEUR_PART_SGL variant are the proposals that perform best. Additionally, we show that they obtain better results than the ones published in the literature. (c) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页码:96 / 116
页数:21
相关论文
共 50 条
  • [31] Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method
    Kellegoz, Talip
    ANNALS OF OPERATIONS RESEARCH, 2017, 253 (01) : 377 - 404
  • [32] Mixed-model multi-manned assembly line balancing problem: a mathematical model and a simulated annealing approach
    Roshani, Abdolreza
    Nezami, Farnaz Ghazi
    ASSEMBLY AUTOMATION, 2017, 37 (01) : 34 - 50
  • [33] Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method
    Talip Kellegöz
    Annals of Operations Research, 2017, 253 : 377 - 404
  • [34] Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem
    Borba, Leonardo
    Ritt, Marcus
    Miralles, Cristobal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 270 (01) : 146 - 156
  • [35] Heuristic procedures for solving the general assembly line balancing problem with setups
    Martino, Luigi
    Pastor, Rafael
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (06) : 1787 - 1804
  • [36] A new mixed-integer linear programming formulation and particle swarm optimization based hybrid heuristic for the problem of resource investment and balancing of the assembly line with multi-manned workstations
    Sahin, Murat
    Kellegoz, Talip
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 133 : 107 - 120
  • [37] A robust MILP and gene expression programming based on heuristic rules for mixed-model multi-manned assembly line balancing
    Zhang, Zikai
    Tang, Qiuhua
    Chica, Manuel
    APPLIED SOFT COMPUTING, 2021, 109
  • [38] An exact method with decomposition techniques and combinatorial Benders' cuts for the type-2 multi-manned assembly line balancing problem
    Michels, Adalberto Sato
    Lopes, Thiago Cantos
    Magatao, Leandro
    OPERATIONS RESEARCH PERSPECTIVES, 2020, 7
  • [39] An efficient migrating birds optimization algorithm with idle time reduction for Type-Ⅰ multi-manned assembly line balancing problem
    ZHANG Zikai
    TANG Qiuhua
    LI Zixiang
    HAN Dayong
    JournalofSystemsEngineeringandElectronics, 2021, 32 (02) : 286 - 296
  • [40] Resource-constrained assembly line balancing problems with multi-manned workstations
    Chen, Yin-Yann
    Cheng, Chen-Yang
    Li, Jia-Ying
    JOURNAL OF MANUFACTURING SYSTEMS, 2018, 48 : 107 - 119