Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints

被引:12
|
作者
Andreu-Casas, Enric [1 ]
Garcia-Villoria, Alberto [1 ]
Pastor, Rafael [1 ]
机构
[1] Univ Politecn Catalunya UPC, Inst Ind & Control Engn IOC, Ave Diagonal 647 Bldg ETSEIB,11th floor, Barcelona 08028, Spain
关键词
combinatorial optimization; Assembly line balancing; Multi-manned workstations; Dependent task times; Ad-hoc heuristic; Relax-and-Fix; MATHEMATICAL-MODEL; ALGORITHM; DESIGN; FORMULATION; WORKERS;
D O I
10.1016/j.ejor.2021.12.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper aims to study a variant of the multi-manned assembly line balancing problem (MALBP), which considers the possibility of multiple workers simultaneously performing different tasks at the same workstation. In most cases it is assumed that task times are deterministic. This paper takes into account possible interferences between workers and deals with the MALBP with task times depending on the number of workers at the station. Different procedures are developed: resolutions on the basis of a mathematical model, two Relax-and-Fix procedures, a heuristic based on solving a partition problem with constraints (named "HEUR_PART") and a set of other variants of the HEUR_PART procedure. The computational experiments indicate that HEUR_PART and the HEUR_PART_SGL variant are the proposals that perform best. Additionally, we show that they obtain better results than the ones published in the literature. (c) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页码:96 / 116
页数:21
相关论文
共 50 条
  • [41] Multi-manned assembly line balancing with time and space constraints: A MILP model and memetic ant colony system
    Zhang, Zikai
    Tang, Qiuhua
    Chica, Manuel
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 150 (150)
  • [42] A dynamic programming based heuristic for the assembly line balancing problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) : 787 - 794
  • [43] A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
    Park, KC
    Park, SS
    Kim, WH
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (02) : 321 - 332
  • [44] Heuristic and Backtracking Algorithm for Multimanned Assembly Line Balancing Problem with Location Constraints
    Krenczyk, Damian
    Dziki, Karol
    CYBERNETICS AND SYSTEMS, 2020, 51 (07) : 698 - 713
  • [45] An efficient migrating birds optimization algorithm with idle time reduction for Type-I multi-manned assembly line balancing problem
    Zhang Zikai
    Tang Qiuhua
    Li Zixiang
    Han Dayong
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2021, 32 (02) : 286 - 296
  • [46] Note to: a mathematical model and ant colony algorithm for multi-manned assembly line balancing problem (vol 89, pg 1935, 2017)
    Yilmaz, Hamid
    Yilmaz, Mustafa
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 89 (5-8): : 1941 - 1941
  • [47] Multi-manned disassembly line balancing problems for retired power batteries based on hyper-heuristic reinforcement
    Chu, Mengling
    Chen, Weida
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [48] Multi-manned assembly line balancing with sequence-dependent set-up times using an enhanced migrating birds optimization algorithm
    Zhang, Zikai
    Tang, Qiuhua
    Han, Dayong
    Li, Zixiang
    ENGINEERING OPTIMIZATION, 2023, 55 (07) : 1243 - 1262
  • [49] Complex multi-manned assembly line balancing using improved water wave algorithm
    Zhang M.
    Fu Y.
    Zhu J.
    Deng S.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (01): : 129 - 143
  • [50] Game theory-oriented approach for disassembly line worker assignment and balancing problem with multi-manned workstations
    Kose, Yildiz
    Cevikcan, Emre
    Ertemel, Sinan
    Murat, Mirac
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 181