An aircraft final assembly line balancing problem considering resource constraints and parallel task scheduling

被引:7
|
作者
Bao, Zhongkai [1 ]
Chen, Lu [1 ]
Qiu, Kejun [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, 800 Dongchuan Rd, Shanghai 201100, Peoples R China
基金
中国国家自然科学基金;
关键词
Aircraft final assembly line; Assembly line balancing problem; Resource constraints; Construction and improvement heuristic; approach; Priority rule; GENETIC ALGORITHM; INVESTMENT;
D O I
10.1016/j.cie.2023.109436
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this study, the balancing problem of an aircraft final assembly line (AFAL) is investigated. The decision is to assign all the assembly tasks to a given number of workstations, with the objectives to balance the workstation cycle time and to minimize the total resource investment cost. An integer linear programming model is developed to formulate the problem. A construction and improvement based two-stage heuristic approach is proposed to solve this problem. In the first stage, an initial task assignment is constructed based on rules that are evolved by a multi-dimensional archive of phenotypic elites algorithm. In the second stage, an improvement heuristic, consisting of several customized neighborhood operators, is developed to improve the initial task assignment. The proposed approach is compared with the existing methods and its variants. Computational experiments and a real case study reveal the superiority of our proposed approach.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Assembly Line Worker Assignment and Balancing Problem with Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Kim, Hyun-Jung
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 3 - 11
  • [22] Cooperative Task Scheduling and Planning Considering Resource Conflicts and Precedence Constraints
    Li, Donghui
    Su, Hu
    Xu, Xinyi
    Wang, Qingbin
    Qin, Jie
    Zou, Wei
    INTERNATIONAL JOURNAL OF PRECISION ENGINEERING AND MANUFACTURING, 2023, 24 (09) : 1503 - 1516
  • [23] Cooperative Task Scheduling and Planning Considering Resource Conflicts and Precedence Constraints
    Donghui Li
    Hu Su
    Xinyi Xu
    Qingbin Wang
    Jie Qin
    Wei Zou
    International Journal of Precision Engineering and Manufacturing, 2023, 24 : 1503 - 1516
  • [24] The Assembly Line Balancing Problem with Task Splitting: A Case Study
    Grzechca, W.
    Foulds, L. R.
    IFAC PAPERSONLINE, 2015, 48 (03): : 2002 - 2008
  • [25] The Distributed Parallel Machine and Assembly Scheduling Problem with eligibility constraints
    Hatami, Sara
    Ruiz, Ruben
    Andres-Romano, Carlos
    INTERNATIONAL JOURNAL OF PRODUCTION MANAGEMENT AND ENGINEERING, 2015, 3 (01) : 13 - 23
  • [26] A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints
    Akpinar, Sener
    Bayhan, G. Mirac
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2011, 24 (03) : 449 - 457
  • [27] Assembly line resource assignment and balancing problem of type 2
    Hager, Triki
    Ahmed, Mellouli
    Faouzi, Masmoudi
    Lecture Notes in Mechanical Engineering, 2013, 1 : 627 - 634
  • [28] A survey of the literature on the multiple or parallel assembly line balancing problem
    Lusa, Amaia
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 2 (01) : 50 - 72
  • [29] A Tabu Search Algorithm for the Parallel Assembly Line Balancing Problem
    Ozcan, Ugur
    Cercioglu, Hakan
    Gokcen, Hadi
    Toklu, Bilal
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2009, 22 (04): : 313 - 323
  • [30] A SIMULATED ANNEALING APPROACH FOR PARALLEL ASSEMBLY LINE BALANCING PROBLEM
    Cercioglu, Hakan
    Ozcan, Ugur
    Gokcen, Hadi
    Toklu, Bilal
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2009, 24 (02): : 331 - 341