Effective Risk Assessment of Complicated EPC Projects: A Case Study of Wastewater Treatment Plant Projects

被引:0
|
作者
Vo, Huy Minh [1 ]
Yang, Jyh-Bin [1 ]
Rangasamy, Veerakumar [1 ]
机构
[1] Graduate Institute Program of Construction Engineering and Management, Dept. of Civil Engineering, National Central Univ., Zhongli District, Taoyuan City,320317, Taiwan
关键词
Behavioral research - Benchmarking - Error detection - High temperature testing - Life cycle - Process engineering - Project management - Risk management - Structural design - Water treatment plants;
D O I
10.1061/AJRUA6.RUENG-1533
中图分类号
学科分类号
摘要
Risks are inevitable in engineering, procurement, and construction (EPC) projects. Wastewater treatment plant (WWTP) projects, which play a crucial role in enhancing environmental sustainability and promoting national climate-resilient development, are frequently delivered by the EPC approach. However, effective risk assessment (RA) processes tailored to complicated EPC projects are still lacking. This research aims to develop a robust RA process through an empirical study of EPC-WWTP projects in Vietnam’s Mekong Delta region. The proposed RA process includes six key steps: obtaining potential EPC risks by an intensive literature review, identifying suitable risk drivers by a prepilot survey, evaluating suitable risk drivers by semistructured interviews, prioritizing risk factors by a questionnaire survey, confirming risk factors by statistical analyses, and validating RA outcomes and proposed RA process by a focus group discussion with Delphi method. RA’s outcomes indicate that risk drivers in the project preparation phase critically impact subsequent phases. Of 67 risk drivers, seven key risk factors that heavily impact EPC-WWTP projects are (1) preparatory project deficiencies, (2) legal and land acquisition hurdles, (3) management and stakeholders’ collaboration challenges, (4) contractor performance issues, (5) bureaucratic complications, (6) unforeseen site conditions and others-related, and (7) operational and maintenance gaps. The validated RA process can be adopted for complicated EPC projects and be a benchmark of RA for other large-scale projects. Practical Applications: Risks are inherent in engineering, procurement, and construction (EPC) projects, including wastewater treatment plant (WWTP) projects that are vital for environmental sustainability and national climate-resilient development. However, effective risk assessment (RA) processes tailored to the complexities of EPC projects remain insufficient. This study addresses this gap by developing a robust RA process through an empirical study of EPC-WWTP projects in Vietnam’s Mekong Delta. Although specific to the Mekong Delta, the validated RA process establishes a foundation adaptable to other complicated EPC projects and regions. The proposed RA process guides project stakeholders in identifying and evaluating risks for further effective responses. Notably, the seven key factors identified in this study can serve as a foundation for future quantitative analyses across the project life cycle (PLC) to measure interdependencies and implement timely countermeasures. © 2025 American Society of Civil Engineers.
引用
收藏
相关论文
共 50 条
  • [21] Preliminary risk assessment in it projects
    Chernysheva, T. Y.
    INNOVATION MATERIALS AND MANUFACTURING TECHNOLOGIES, ECONOMIC ASPECTS IN ENTERPRISES, 2013, 379 : 220 - 223
  • [22] Risk assessment in ERP projects
    Aloini, Davide
    Dulmin, Riccardo
    Mininno, Valeria
    INFORMATION SYSTEMS, 2012, 37 (03) : 183 - 199
  • [23] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [24] Exploring barriers to effective safety risk assessment in Indian construction projects
    Chellappa, Vigneshkumar
    Salve, Urmi Ravindra
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2023, 176 (03) : 122 - 130
  • [25] Integrated project delivery implementation framework for water and wastewater treatment plant projects
    Andary, Elie Georges
    Shdid, Caesar Abi
    Chowdhury, Arindam
    Ahmad, Irtishad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (03) : 609 - 633
  • [26] Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran
    Charkhakan, Mohammad Hadi
    Heravi, Gholamreza
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (11)
  • [27] Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects
    Shdid, Caesar Abi
    Andary, Elie
    Chowdhury, Arindam Gan
    Ahmad, Irtishad U.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (02)
  • [28] Environmental assessment for wastewater reclamation and reuse projects
    Kontos, N
    Asano, T
    WATER SCIENCE AND TECHNOLOGY, 1996, 33 (10-11) : 473 - 486
  • [29] Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects
    El-Kholy, Amr Metwally
    Akal, Ahmed Yousry
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (10) : 3014 - 3040
  • [30] RISK ASSESSMENT THROUGH CONSTRUCTION SEQUENCE ANALYSIS FOR PLANT CONSTRUCTION PROJECTS
    Kim, Jihye
    Choi, Jaehyun
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 495 - 500