Effective Risk Assessment of Complicated EPC Projects: A Case Study of Wastewater Treatment Plant Projects

被引:0
|
作者
Vo, Huy Minh [1 ]
Yang, Jyh-Bin [1 ]
Rangasamy, Veerakumar [1 ]
机构
[1] Graduate Institute Program of Construction Engineering and Management, Dept. of Civil Engineering, National Central Univ., Zhongli District, Taoyuan City,320317, Taiwan
关键词
Behavioral research - Benchmarking - Error detection - High temperature testing - Life cycle - Process engineering - Project management - Risk management - Structural design - Water treatment plants;
D O I
10.1061/AJRUA6.RUENG-1533
中图分类号
学科分类号
摘要
Risks are inevitable in engineering, procurement, and construction (EPC) projects. Wastewater treatment plant (WWTP) projects, which play a crucial role in enhancing environmental sustainability and promoting national climate-resilient development, are frequently delivered by the EPC approach. However, effective risk assessment (RA) processes tailored to complicated EPC projects are still lacking. This research aims to develop a robust RA process through an empirical study of EPC-WWTP projects in Vietnam’s Mekong Delta region. The proposed RA process includes six key steps: obtaining potential EPC risks by an intensive literature review, identifying suitable risk drivers by a prepilot survey, evaluating suitable risk drivers by semistructured interviews, prioritizing risk factors by a questionnaire survey, confirming risk factors by statistical analyses, and validating RA outcomes and proposed RA process by a focus group discussion with Delphi method. RA’s outcomes indicate that risk drivers in the project preparation phase critically impact subsequent phases. Of 67 risk drivers, seven key risk factors that heavily impact EPC-WWTP projects are (1) preparatory project deficiencies, (2) legal and land acquisition hurdles, (3) management and stakeholders’ collaboration challenges, (4) contractor performance issues, (5) bureaucratic complications, (6) unforeseen site conditions and others-related, and (7) operational and maintenance gaps. The validated RA process can be adopted for complicated EPC projects and be a benchmark of RA for other large-scale projects. Practical Applications: Risks are inherent in engineering, procurement, and construction (EPC) projects, including wastewater treatment plant (WWTP) projects that are vital for environmental sustainability and national climate-resilient development. However, effective risk assessment (RA) processes tailored to the complexities of EPC projects remain insufficient. This study addresses this gap by developing a robust RA process through an empirical study of EPC-WWTP projects in Vietnam’s Mekong Delta. Although specific to the Mekong Delta, the validated RA process establishes a foundation adaptable to other complicated EPC projects and regions. The proposed RA process guides project stakeholders in identifying and evaluating risks for further effective responses. Notably, the seven key factors identified in this study can serve as a foundation for future quantitative analyses across the project life cycle (PLC) to measure interdependencies and implement timely countermeasures. © 2025 American Society of Civil Engineers.
引用
收藏
相关论文
共 50 条
  • [31] A Fuzzy-Bayesian Model for Risk Assessment in Power Plant Projects
    Islam, Muhammad Saiful
    Nepal, Madhav
    INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 : 963 - 970
  • [32] A Research on Risks and Challenges of Applying PPP Mode to Water-related Projects - A Study Case of PPP Projects in Anhui Wangxiaoying Wastewater Treatment Plant and Beijing No.10 Waterworks
    Su Lingran
    PROCEEDINGS OF THE FOURTH INTERNATIONAL SYMPOSIUM - MANAGEMENT, INNOVATION & DEVELOPMENT, BK ONE & TWO, 2017, : 1325 - 1343
  • [33] Risk assessment in municipal wastewater treatment plant
    Loj-Pilch, Magdalena
    Zakrzewska, Anita
    Zielewicz, Ewa
    11TH CONFERENCE ON INTERDISCIPLINARY PROBLEMS IN ENVIRONMENTAL PROTECTION AND ENGINEERING (EKO-DOK 2019), 2019, 100
  • [34] Research on Quality Risk Assessment of EPC Projects for Transmission and Distribution Engineering Based on Design Enterprises
    Zhao ZhongZe
    Meng Qichen
    Pang Nansheng
    2020 5TH INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, ENERGY TECHNOLOGY AND ENVIRONMENTAL ENGINEERING, 2020, 571
  • [35] Risk Assessment and the Environmental Impact of Industrial Projects in Malaysia: A case study of SAMUR, Sabah
    Marmaya, Ezyana Anyzah
    Mahbub, Rohana
    ENVIRONMENT-BEHAVIOUR PROCEEDINGS JOURNAL, 2017, 2 (05): : 507 - 519
  • [36] Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2
    Zou, Patrick X. W.
    Li, Jie
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (12) : 1219 - 1238
  • [37] Risk assessment of infrastructure REITs projects based on cloud model: a case study of China
    Wang, Yousong
    Gong, Enqin
    Zhang, Yangbing
    Yao, Yao
    Zhou, Xiaowei
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4330 - 4352
  • [38] ISM Based Method for Risk Management of International EPC Projects
    Song, Yimeng
    Hao, Shengyue
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [39] Managing risk in software development projects: a case study
    Dey, Prasanta Kumar
    Kinch, Jason
    Ogunlana, Stephen O.
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2007, 107 (1-2) : 284 - 303
  • [40] Study on Purchasing Process Optimization of Overseas EPC Projects
    Wang Chao
    Zhang Lingling
    PROCEEDINGS OF THE THIRD INTERNATIONAL SYMPOSIUM ON REGIONAL MANAGEMENT SCIENCE AND ENGINEERING, 2011, : 348 - 351