Integrated project delivery implementation framework for water and wastewater treatment plant projects

被引:24
|
作者
Andary, Elie Georges [1 ]
Shdid, Caesar Abi [2 ]
Chowdhury, Arindam [3 ]
Ahmad, Irtishad [4 ]
机构
[1] Hazen & Sawyer, New York, NY USA
[2] Lebanese Amer Univ, Dept Civil Engn, Beirut, Lebanon
[3] Florida Int Univ, Coll Engn & Comp, Dept Civil & Environm Engn, Miami, FL 33199 USA
[4] Amer Univ Sharjah, Dept Civil Engn, Sharjah, U Arab Emirates
关键词
Construction; Project management; Novel model; DESIGN-BUILD; PERFORMANCE; SUCCESS;
D O I
10.1108/ECAM-02-2019-0075
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years. Shortcomings inherent to DBB have had a negative effect on the key performance indicators (KPIs) of these projects. Numerous studies have been published about the benefits offered by integrated project delivery (IPD) in improving the delivery of DBB projects. Links correlating IPD principles to improvements in KPIs of DBB construction projects have not been established scientifically, thus leaving owners with no guidance on which IPD principle(s) to implement in order to improve a particular project KPI. The paper aims to discuss this issue. Design/methodology/approach Actual data were collected from 43 water and wastewater construction projects - including two control projects with full implementation of selective IPD principles - and used to compute major projects KPIs. Regression analysis and a focus group are then utilized to determine the effect of each implemented IPD principle on various project KPIs. Findings Implementation of open communication was found to have a significant effect on reducing project cost overrun, and the co-location of teams significantly reduced the time to respond to RFIs. Collaborative decision making significantly reduced the cost of field rework. Other IPD principles showed less-significant effects on project KPIs and were concluded to be ineffective at improving the projects' performance. Practical implications - An implementation framework is developed that can guide utility owners on which IPD principle(s) to implement in order to improve specific project KPIs. Originality/value This study demonstrates that not all IPD principles will result in performance improvement of a project. A selective and cost-effective implementation of certain IPD principle will have to be based on the nature of the project and the particular KPIs targeted for improvement.
引用
收藏
页码:609 / 633
页数:25
相关论文
共 50 条
  • [1] Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects
    Shdid, Caesar Abi
    Andary, Elie
    Chowdhury, Arindam Gan
    Ahmad, Irtishad U.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (02)
  • [2] Implementation and optimization project for CDM certification in wastewater treatment plant
    Pereira da Silva, Welitom Ttatom
    Lima Duarte, Anaxsandra da Costa
    Almeida de Souza, Marco Antonio
    ENGENHARIA SANITARIA E AMBIENTAL, 2012, 17 (01) : 13 - 24
  • [3] Integrated Project Delivery: The Obstacles of Implementation
    Fish, Amanda J.
    Keen, Julia
    ASHRAE TRANSACTIONS 2012, VOL 118, PT 1, 2012, 118 : 90 - 97
  • [4] Risks Involved in Using Alternative Project Delivery (APD) Methods in Water and Wastewater Projects
    Shrestha, Pramen P.
    Batista, Jacimaria
    Maharjan, Ruiko
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 219 - 223
  • [5] Production CAD implementation for water and wastewater treatment plant design
    Glaser, H.T.
    Howe, K.J.
    Warren, G.L.
    National Conference Publication - Institution of Engineers, Australia, 1989, (89 pt 8):
  • [6] READINESS ASSESSMENT FOR IMPLEMENTATION OF INTEGRATED PROJECT DELIVERY (IPD) IN INDUSTRIALISED BUILDING SYSTEM (IBS) PROJECTS
    Osman, W. N.
    Nawi, M. N. M.
    Anuar, H. S.
    Radzuan, K.
    Osman, N. N.
    JURNAL TEKNOLOGI, 2015, 77 (04): : 91 - 95
  • [7] Which Delivery Method Is Best for Water and Wastewater Infrastructure Projects? An Analysis of Alternative Project Delivery Methods Performance
    El Asmar, Mounir
    Ariaratnam, Samuel T.
    PIPELINES 2018: PLANNING AND DESIGN, 2018, : 328 - 333
  • [8] An Integrated Framework for Selecting the Optimum Project Delivery System in Post-conflict Construction Projects
    Pooyan, Mahmood-Reza
    Al-Sakkaf, Abobakr
    Abdelkader, Eslam Mohammed
    Zayed, Tarek
    Gopakumar, Govind
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2023, 21 (08) : 1359 - 1384
  • [9] An Integrated Framework for Selecting the Optimum Project Delivery System in Post-conflict Construction Projects
    Mahmood-Reza Pooyan
    Abobakr Al-Sakkaf
    Eslam Mohammed Abdelkader
    Tarek Zayed
    Govind Gopakumar
    International Journal of Civil Engineering, 2023, 21 : 1359 - 1384
  • [10] Licensing and Project Management Implementation of the Licensing Procedures and Extension of the Wastewater Treatment Plant
    不详
    WOCHENBLATT FUR PAPIERFABRIKATION, 2018, 146 (11): : 640 - 640