共 50 条
- [43] ESTABLISHING RELIABLE COAL FLOW IN POWER PLANTS. Power Engineering (Barrington, Illinois), 1981, 85 (11): : 90 - 93
- [44] On the assimilating, tissues of some Coal Measure Plants. PROCEEDINGS OF THE CAMBRIDGE PHILOSOPHICAL SOCIETY, 1910, 15 : 413 - 415
- [46] Coal dust treatment in large power plants. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1926, 70 : 952 - 955
- [47] LICENSING COAL-FIRED POWER PLANTS. Power Engineering (Barrington, Illinois), 1978, 82 (01): : 34 - 42
- [48] METALLIC CORROSION IN COAL GASIFICATION PILOT PLANTS. Corrosion '77 $-$ Int Corros forum Devoted Exclusively to the Prot and Perform of Mater, 1977, : 1 - 50
- [49] MECHANICAL AND PROCESS ASPECTS OF COAL GRINDING PLANTS. World Cement, 1983, 14 (07): : 247 - 259
- [50] Problems in modernization of automation systems at coal preparation plants XI ALL-RUSSIAN SCIENTIFIC AND PRACTICAL CONFERENCE (WITH INTERNATIONAL PARTICIPATION) AUTOMATION SYSTEMS IN EDUCATION, SCIENCE AND PRODUCTION, 2017, 2018, 354