OPTIMIZATION BASED HEURISTIC FOR SCHEDULING PARALLEL PROJECT NETWORKS WITH CONSTRAINED RENEWABLE RESOURCES.

被引:0
|
作者
Weiss, Elliott N. [1 ]
机构
[1] Univ of Virginia, Charlottesville,, VA, USA, Univ of Virginia, Charlottesville, VA, USA
关键词
The author would like to thank Roben L. Nydick; Jr. for suggesting this problem and James L. Patterson for providing the data set of sample problems and the source listing of the multiple project scheduling program (MPSP). A major portion of the research for this paper was performed while the author was on the faculty of the Johnson Graduate School of Management at Cornell University;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:137 / 143
相关论文
共 50 条
  • [41] A NEW HEURISTIC SOLUTION METHOD IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    BELL, CE
    HAN, J
    NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 315 - 331
  • [42] A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling
    Pilar Tormos
    Antonio Lova
    Annals of Operations Research, 2001, 102 : 65 - 81
  • [43] A Novel Heuristic Algorithm for Spatial Resource Constrained Project Scheduling Problem
    Yu, Xiaoguang
    Zhan, Dechen
    Nie, Lanshun
    INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 1448 - 1453
  • [44] A heuristic method for resource constrained allocation in multi-project scheduling
    Ghomi, SMTF
    Ashjari, B
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 2002, 26 (B1): : 111 - 116
  • [45] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [46] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [47] Resource-constrained project scheduling:: A critical activity reordering heuristic
    Valls, V
    Quintanilla, S
    Ballestín, F
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 282 - 301
  • [48] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
    Guo, Fang Ming
    Ma, Li
    He, Min
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
  • [49] Single mode resource constrained project scheduling with unreliable resources
    Chakrabortty, Ripon K.
    Sarker, Ruhul A.
    Essam, Daryl L.
    OPERATIONAL RESEARCH, 2020, 20 (03) : 1369 - 1403
  • [50] Single mode resource constrained project scheduling with unreliable resources
    Ripon K. Chakrabortty
    Ruhul A. Sarker
    Daryl L. Essam
    Operational Research, 2020, 20 : 1369 - 1403