OPTIMIZATION BASED HEURISTIC FOR SCHEDULING PARALLEL PROJECT NETWORKS WITH CONSTRAINED RENEWABLE RESOURCES.

被引:0
|
作者
Weiss, Elliott N. [1 ]
机构
[1] Univ of Virginia, Charlottesville,, VA, USA, Univ of Virginia, Charlottesville, VA, USA
关键词
The author would like to thank Roben L. Nydick; Jr. for suggesting this problem and James L. Patterson for providing the data set of sample problems and the source listing of the multiple project scheduling program (MPSP). A major portion of the research for this paper was performed while the author was on the faculty of the Johnson Graduate School of Management at Cornell University;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:137 / 143
相关论文
共 50 条
  • [31] Robust Project Scheduling with Unreliable Resources: A Variable Neighbourhood Search Based Heuristic Approach
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 656 - 660
  • [32] A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
    Rabbani, M.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Lahiji, N. S.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) : 794 - 808
  • [33] OPTIMIZATION OF PROJECT SCHEDULING UNDER CONSTRAINED RESOURCES USING THE DEPENDENCY STRUCTURE MATRIX AND WHALE ALGORITHM
    Vu-Hong-Son, Pham
    Ton-Dat, Pham
    Huynh-Chi-duy, Nguyen
    Journal of Technology, 2022, 37 (01): : 1 - 16
  • [34] Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints
    Karnebogen, Mareike
    Zimmermann, Juergen
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 173 - 192
  • [35] An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources
    Chakrabortty, Ripon K.
    Rahman, Humyun Fuad
    Haque, Khan M. A.
    Paul, Sanjoy Kumar
    Ryan, Michael J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 151
  • [36] A heuristic resource scheduling scheme in time-constrained networks
    Kim, Yang G.
    Wang, Yu
    Park, ByoungSeob
    Choi, Hyo Hyun
    COMPUTERS & ELECTRICAL ENGINEERING, 2016, 54 : 1 - 15
  • [37] A heuristic approach for resource constrained project scheduling with uncertain activity durations
    Bruni, M. E.
    Beraldi, P.
    Guerriero, F.
    Pinto, E.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1305 - 1318
  • [38] A resource constrained project scheduling problem with reattempt at failure: A heuristic approach
    Mori, M
    Tseng, CC
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 33 - 44
  • [39] A competitive heuristic solution technique for Resource-Constrained Project Scheduling
    Tormos, P
    Lova, A
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 65 - 81
  • [40] COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DAVIS, EW
    PATTERSON, JH
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08): : 944 - 955