共 50 条
- [21] Resource–constrained project scheduling: a heuristic for the multi–mode case OR-Spektrum, 2001, 23 : 335 - 357
- [22] A genetic programming approach for heuristic selection in constrained project scheduling INTERFACES IN COMPUTER SCIENCE AND OPERATIONS RESEARCH: ADVANCES IN METAHEURISTICS, OPTIMIZATION, AND STOCHASTIC MODELING TECHNOLOGIES, 1997, : 405 - 421
- [23] A heuristic approach to fuzzy resource-constrained project scheduling COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
- [24] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems 2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
- [25] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
- [27] Research on resource-constrained project scheduling method based on heuristic priority rules Computer Modelling and New Technologies, 2014, 18 (01): : 143 - 150
- [29] USE OF QGIS OPEN SOFTWARE TO DEFINE THE LOCAL RENEWABLE ENERGY RESOURCES. A PROJECT BASED LEARNING EXPERIENCE 12TH INTERNATIONAL TECHNOLOGY, EDUCATION AND DEVELOPMENT CONFERENCE (INTED), 2018, : 2577 - 2583