OPTIMIZATION BASED HEURISTIC FOR SCHEDULING PARALLEL PROJECT NETWORKS WITH CONSTRAINED RENEWABLE RESOURCES.

被引:0
|
作者
Weiss, Elliott N. [1 ]
机构
[1] Univ of Virginia, Charlottesville,, VA, USA, Univ of Virginia, Charlottesville, VA, USA
关键词
The author would like to thank Roben L. Nydick; Jr. for suggesting this problem and James L. Patterson for providing the data set of sample problems and the source listing of the multiple project scheduling program (MPSP). A major portion of the research for this paper was performed while the author was on the faculty of the Johnson Graduate School of Management at Cornell University;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:137 / 143
相关论文
共 50 条
  • [21] Resource–constrained project scheduling: a heuristic for the multi–mode case
    Roland Heilmann
    OR-Spektrum, 2001, 23 : 335 - 357
  • [22] A genetic programming approach for heuristic selection in constrained project scheduling
    Padman, R
    Roehrig, SF
    INTERFACES IN COMPUTER SCIENCE AND OPERATIONS RESEARCH: ADVANCES IN METAHEURISTICS, OPTIMIZATION, AND STOCHASTIC MODELING TECHNOLOGIES, 1997, : 405 - 421
  • [23] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [24] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems
    Chand, Shelvin
    Singh, Hemant Kumar
    Ray, Tapabrata
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
  • [25] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [26] A simple and effective heuristic for the resource constrained project scheduling problem
    DePuy, GW
    Whitehouse, GE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) : 3275 - 3287
  • [27] Research on resource-constrained project scheduling method based on heuristic priority rules
    Wang, Bing
    Chen, Tinggui
    Zhou, Guanglan
    Xu, Chonghuan
    Computer Modelling and New Technologies, 2014, 18 (01): : 143 - 150
  • [28] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [29] USE OF QGIS OPEN SOFTWARE TO DEFINE THE LOCAL RENEWABLE ENERGY RESOURCES. A PROJECT BASED LEARNING EXPERIENCE
    Gonzalez Alriols, M.
    Campos-Celador, A.
    Ulazia, A.
    Urresti, A.
    Ibarra-Berastegi, G.
    Antxustegi, M. M.
    12TH INTERNATIONAL TECHNOLOGY, EDUCATION AND DEVELOPMENT CONFERENCE (INTED), 2018, : 2577 - 2583
  • [30] Time-constrained project scheduling with adjacent resources
    Hurink, J. L.
    Kok, A. L.
    Paulus, J. J.
    Schutten, J. M. J.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 310 - 319