OPTIMIZATION BASED HEURISTIC FOR SCHEDULING PARALLEL PROJECT NETWORKS WITH CONSTRAINED RENEWABLE RESOURCES.

被引:0
|
作者
Weiss, Elliott N. [1 ]
机构
[1] Univ of Virginia, Charlottesville,, VA, USA, Univ of Virginia, Charlottesville, VA, USA
关键词
The author would like to thank Roben L. Nydick; Jr. for suggesting this problem and James L. Patterson for providing the data set of sample problems and the source listing of the multiple project scheduling program (MPSP). A major portion of the research for this paper was performed while the author was on the faculty of the Johnson Graduate School of Management at Cornell University;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:137 / 143
相关论文
共 50 条
  • [2] HEURISTIC ALGORITHM FOR PROJECT SCHEDULING WITH LIMITED RESOURCES.
    Jain, T.C.
    Hardas, A.M.
    Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1984, 65 : 6 - 9
  • [3] An efficient multi-pass heuristic for project scheduling with constrained resources
    Tormos, P
    Lova, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (05) : 1071 - 1086
  • [4] Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources
    Farughi, H.
    Amiri, A.
    Abdi, F.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (05): : 780 - 791
  • [5] Heuristic Optimization for the Resource Constrained Project Scheduling Problem: a Systematic Mapping
    Ciupe, Aurelia
    Meza, Serban
    Orza, Bogdan
    PROCEEDINGS OF THE 2016 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2016, 8 : 619 - 626
  • [6] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [7] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Weimin Ma
    Yangyang Che
    Hu Huang
    Hua Ke
    International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621
  • [8] Heuristic Algorithms for Scheduling Resources in Time-Constrained Wireless Sensor Networks
    Kim, Y. G.
    Wang, Yu
    Park, B. S.
    Choi, H. H.
    2015 INTERNATIONAL CONFERENCE ON PLATFORM TECHNOLOGY AND SERVICE (PLATCON), 2015, : 33 - 34
  • [9] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [10] A neural network based heuristic for resource-constrained project scheduling
    Shou, YY
    ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 794 - 799