Ten-year Operation of the River Power Plant of the Danube Hydroelectric Power Plant Co. in West Germany.

被引:0
|
作者
Ertl, Walter
von Tubeuf, Manfred
机构
来源
eb - Elektrische Bahnen | 1981年 / 79卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Four hydroelectric power stations of the Donau-Wasserkraft AG erected between 1965 and 1971 have proved successfully during ten years of operation the expectations set on them. Emphasis was put on satisfactory blending with the environment. The energy production is adapted to the demands of the West German Railroad System by a suitable mode of operation.
引用
收藏
页码:263 / 266
相关论文
共 50 条
  • [41] Distribution of Siluriformes in a river under the influence of a small hydroelectric power plant of the Parana River Basin, Brazil
    Garcia, Thiago D.
    Ota, Renata R.
    Ferreira, Dhiego G.
    Nascimento, Raul H. C.
    Galindo, Bruno A.
    Pereira, Larissa S.
    Zanatta, Augusto S.
    IHERINGIA SERIE ZOOLOGIA, 2020, 110
  • [42] Control strategies for flexible operation of power plant with CO2 capture plant
    Lin, Yu-Jeng
    Wong, David Shan-Hill
    Jang, Shi-Shang
    Ou, Jenq-Jang
    AICHE JOURNAL, 2012, 58 (09) : 2697 - 2704
  • [43] Experience Gained in the Early Stages of Operation of the New 3000 tpd Kiln Plant at the Schelklingen, West Germany.
    Kadel, H.P.
    Zement-Kalk-Gips, 1974, 27 (03): : 111 - 117
  • [44] Pumped-storage hydroelectric power plant in the Jurassic karst aquifer of the swabian alb, Germany
    Neukum, Christoph
    Koehler, Hans Joachim
    Fernandez-Steeger, Tomas
    Hennings, Sibylle
    Azzam, Rafig
    GRUNDWASSER, 2014, 19 (02) : 107 - 117
  • [45] SHIN-TOKUNOSHIMA OTEC PILOT PLANT FOR THE KYUSHU ELECTRIC POWER CO.
    Anon
    Technical Review - Mitsubishi Heavy Industries, 1983, 20 (03): : 285 - 286
  • [46] INFLUENCE OF THE OPERATION OF A PUMPED-STORAGE HYDROELECTRIC POWER PLANT ON THE RESERVOIR'S THERMAL STRUCTURE
    Bermudez, Maria
    Cea, Luis
    Puertas, Jeronimo
    Rodriguez, Nuria
    Baztan, Javier
    PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM, 2015, : 4621 - 4629
  • [47] The suspended load in the water-storage reservoir of the hydroelectric power plant Bostanj on the Sava River
    Dolinar, B.
    Vrecl-Kojc, H.
    RIVER BASIN MANAGEMENT V, 2009, 124 : 257 - 265
  • [48] River dams and the stability of bird communities: A hierarchical Bayesian analysis in a tropical hydroelectric power plant
    Abreu, Tarcisio L. S.
    Berg, Sandro B.
    de Faria, Iubata P.
    Gomes, Leonardo P.
    Marinho-Filho, Jader S.
    Colli, Guarino R.
    JOURNAL OF APPLIED ECOLOGY, 2020, 57 (06) : 1124 - 1136
  • [49] Ten year Sr-90 survey at the Krsko Nuclear Power Plant
    Vokal, B
    Fedina, S
    Burger, J
    Kobal, I
    ANNALI DI CHIMICA, 1998, 88 (9-10) : 731 - 741
  • [50] Control strategies for flexible operation of power plant integrated with CO2 capture plant
    Lin, Yu-Jeng
    Chang, Chun-Cheng
    Wong, David Shan-Hill
    Jang, Shi-Shang
    Ou, Jenq-Jang
    11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 : 1366 - 1371