Ten-year Operation of the River Power Plant of the Danube Hydroelectric Power Plant Co. in West Germany.

被引:0
|
作者
Ertl, Walter
von Tubeuf, Manfred
机构
来源
eb - Elektrische Bahnen | 1981年 / 79卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Four hydroelectric power stations of the Donau-Wasserkraft AG erected between 1965 and 1971 have proved successfully during ten years of operation the expectations set on them. Emphasis was put on satisfactory blending with the environment. The energy production is adapted to the demands of the West German Railroad System by a suitable mode of operation.
引用
收藏
页码:263 / 266
相关论文
共 50 条
  • [31] Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study
    Tuna, M. Cihat
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (06) : 1359 - 1367
  • [32] NUCLEAR-POWER PLANT CONSTRUCTION IN WEST-GERMANY
    不详
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1981, 26 (07): : R4 - R4
  • [33] Ten-year radiocesium fluvial discharge patterns from watersheds contaminated by the Fukushima nuclear power plant accident
    Ueda, Shinji
    Hasegawa, Hidenao
    Ohtsuka, Yoshihito
    Ochiai, Shinya
    Tani, Takashi
    JOURNAL OF ENVIRONMENTAL RADIOACTIVITY, 2021, 240
  • [34] Optimal Operation of Run of River Small Hydro Power Plant
    Vineet Kumar Singh
    S. K. Singal
    BioPhysical Economics and Resource Quality, 2018, 3 (3):
  • [35] Effects on Fluvial Geomorphology and Vegetation Cover following Hydroelectric Power Plant Operation: A Case Study in the Maule River (Chile)
    Pacheco, Fabian
    Rojas, Octavio
    Hernandez, Esteban
    Caamano, Diego
    WATER, 2022, 14 (11)
  • [36] Increased incidence of leukemias in the vicinity of the Krummel Nuclear Power Plant in Northern Germany.
    Greiser, EM
    Hoffmann, W
    AMERICAN JOURNAL OF EPIDEMIOLOGY, 1997, 145 (11) : 194 - 194
  • [37] THE AVR POWER-PLANT IN ITS LAST YEAR OF OPERATION
    MARNET, C
    IVENS, G
    ZIERMANN, E
    ENERGY, 1991, 16 (1-2) : 71 - 77
  • [38] CFD SIMULATION OF THE SUBMERGED COFFERDAMS EFFECT ON THE OPERATION OF THE FUTURE TOCOMA HYDROELECTRIC POWER PLANT
    Stanko, Milan
    Shmueli, Andrea
    Asuaje, Miguel
    Kenyery, Frank
    Montilla, Gonzalo
    Toscano, Maria de los Angeles
    Sanchez, Richard
    PROCEEDINGS OF THE ASME FLUIDS ENGINEERING DIVISION SUMMER CONFERENCE, VOL 1, PTS A-C, 2009, : 1629 - 1638
  • [39] Numerical simulation of three-dimensional flow in the river downstream of a hydroelectric power plant
    Chen, Bihong
    Zhou, Faryih
    Modelling, simulation & control. B, 1988, 16 (02): : 53 - 63
  • [40] Study of Hydroelectric Power Plant Potential of Mahakam River Basin East Kalimantan Indonesia
    Susilowati, Yuliana
    Irasari, Pudji
    Susatyo, Anjar
    2019 INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY ENGINEERING AND APPLICATION (ICSEEA): INNOVATIVE TECHNOLOGY TOWARD ENERGY RESILIENCE, 2019, : 207 - 213