Experience Gained in the Early Stages of Operation of the New 3000 tpd Kiln Plant at the Schelklingen, West Germany.

被引:0
|
作者
Kadel, H.P.
机构
来源
Zement-Kalk-Gips | 1974年 / 27卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Operating results obtained with a 3000 tpd rotary kiln plant equipped with preheater and planetary cooler are reported. Raw material components control with the aid of an X-ray fluorescence and mini-computer installation in conjunction with an automatic sampling station with pneumatic dispatch system is described. The operating performance of the planetary cooler is analyzed and simmarized.
引用
收藏
页码:111 / 117
相关论文
共 6 条