共 50 条
- [35] INDUSTRIAL ROBOT IMPROVES QUALITY ASSURANCE AT PCB TESTING STATION. Siemens Power Engineering & Automation, 1986, 8 (03): : 157 - 158
- [36] Combined cycle turbines used on Snam's compressor station. Part 2. Pipe line industry Houston, Tex., 1988, 69 (05): : 45 - 48
- [37] CO-ORDINATED CONTROL AND MONITORING OF TURBINES AT CASTLE PEAK 'B' POWER STATION. Hong Kong engineer, 1983, 11 (12): : 17 - 23
- [39] RECONSTRUCTION OF ASPHALT SHAFT WATER BARS OF CONTRACTION JOINTS OF SECTIONS OF THE POWERHOUSE AT THE LOWER KAMA HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (10): : 613 - 617