共 50 条
- [22] EXPERIENCE IN OPERATING HYDRAULIC STRUCTURES AND HYDROELECTRIC STATIONS: VERTICAL DRAINAGE IN THE FOUNDATION OF THE OVERFLOW DAM OF THE DNEPRODZERZHINSK HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (03): : 175 - 180
- [23] MODEL INVESTIGATIONS OF SEISMIC ACTION ON THE CONCRETE ARCH DAM OF THE INGURI HYDROELECTRIC STATION. Hydrotechnical Construction, 1985, 19 (11): : 604 - 610
- [24] MECHANICAL EQUIPMENT OF THE CHAMBER OF THE BULKHEAD GATES OF THE DIVERSION TUNNELS OF THE ROGUN HYDROELECTRIC STATION. Hydrotechnical Construction, 1985, 19 (10): : 552 - 555
- [25] ON-SITE OBSERVATIONS BY GEODETIC METHODS AT THE SAYANO-SHUSHENSKOE HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (06): : 314 - 320
- [26] Modernization of vertical Pelton turbines with the help of CFD and model testing 27TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR 2014), PTS 1-7, 2014, 22
- [27] EXPERIENCE IN THE OPERATION OF HYDRAULIC STRUCTURES AND EQUIPMENT OF HYDROELECTRIC STATIONS: LEFT-BANK DAM OF THE BRATSK HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (06): : 278 - 284
- [28] MATHEMATICAL MODELING OF HYDRAULIC REGIMES IN THE TRANSITION BETWEEN THE SURGE TANK AND CONDUITS OF A HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (03): : 105 - 110
- [29] TEMPORAL VARIATION OF THE CHARACTERISTICS OF SANDS IN HYDRAULIC-FILL STRUCTURES OF THE RIGA HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (05): : 200 - 206