共 50 条
- [1] ARCH DAM OF THE KHUDONI HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (07): : 386 - 393
- [2] The Pelton wheel installation at the Nordhausen electrical generation station. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1908, 52 : 1224 - 1229
- [3] SET OF DOCUMENTS FOR OVERHAULING RO400-960-11 TURBINES OF THE INGURI HYDROELECTRIC STATION. Hydrotechnical Construction, 1987, 21 (06): : 374 - 377
- [4] CONCRETE DAM OF THE LENIN DNEPR HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (07): : 381 - 386
- [5] DAMMING THE VOLGA CHANNEL AT THE CHEBOKSARY HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (10): : 465 - 472
- [6] OPERATION OF THE UNDERGROUND DIVERSION OF THE BORISOGLEBSK HYDROELECTRIC STATION. Hydrotechnical Construction, 1985, 19 (03): : 161 - 165
- [7] RECONSTRUCTION OF THE SURGE TANK OF THE SENGILEI HYDROELECTRIC STATION. Hydrotechnical Construction, 1987, 21 (01): : 1 - 5
- [8] SEEPAGE REGIME IN THE FOUNDATION OF THE KANEV HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (07): : 444 - 450
- [9] MODIFICATION OF TURBINE RUNNER BLADES AT THE CHIRKEY HYDROELECTRIC STATION. Hydrotechnical Construction, 1987, 21 (01): : 42 - 45
- [10] CORROSION IN METAL STRUCTURES AT THE MINGECHAUR HYDROELECTRIC POWER STATION. Protection of Metals (English translation of Zaschita Metallov), 1984, 20 (05): : 587 - 590