共 50 条
- [1] MODEL INVESTIGATIONS OF SEISMIC ACTION ON THE CONCRETE ARCH DAM OF THE INGURI HYDROELECTRIC STATION. Hydrotechnical Construction, 1985, 19 (11): : 604 - 610
- [2] CONCRETE DAM OF THE LENIN DNEPR HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (07): : 381 - 386
- [3] Caruachi dam and power station. An emblematic hydroelectric project in Venezuela Revista de Obras Publicas, 2001, 148 (3416): : 39 - 56
- [4] REDUCTION OF THE TIME OF PLACING MATERIALS IN THE CONSTRUCTION OF THE DAM AT THE ROGUN HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (11): : 520 - 525
- [5] EXPERIENCE IN OPERATING HYDRAULIC STRUCTURES AND HYDROELECTRIC STATIONS: VERTICAL DRAINAGE IN THE FOUNDATION OF THE OVERFLOW DAM OF THE DNEPRODZERZHINSK HYDROELECTRIC STATION. Hydrotechnical Construction, 1986, 20 (03): : 175 - 180
- [6] EXPERIENCE IN THE OPERATION OF HYDRAULIC STRUCTURES AND EQUIPMENT OF HYDROELECTRIC STATIONS: LEFT-BANK DAM OF THE BRATSK HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (06): : 278 - 284
- [7] TESTING OF PELTON TURBINES AT THE TATEV HYDROELECTRIC STATION. Soviet Energy Technology (English translation of Energomashinostroenie), 1985, (05): : 66 - 69
- [8] DAMMING THE VOLGA CHANNEL AT THE CHEBOKSARY HYDROELECTRIC STATION. Hydrotechnical Construction, 1984, 18 (10): : 465 - 472
- [9] OPERATION OF THE UNDERGROUND DIVERSION OF THE BORISOGLEBSK HYDROELECTRIC STATION. Hydrotechnical Construction, 1985, 19 (03): : 161 - 165
- [10] RECONSTRUCTION OF THE SURGE TANK OF THE SENGILEI HYDROELECTRIC STATION. Hydrotechnical Construction, 1987, 21 (01): : 1 - 5