共 50 条
- [1] Rock mass deformation analysis of high excavated slope of TGP's shiplift and temporary shiplock Renmin Changjiang/Yangtze River, 30 (08): : 11 - 13
- [2] Rock deformation in off-load loose zone of high excavated slope at TGP's shiplock Renmin Changjiang/Yangtze River, 30 (04): : 4 - 6
- [3] Analysis and prediction for the deformation in deep rock mass behind high excavated rocky slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2002, 33 (04):
- [4] Several issues on the stability of high excavated slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2002, 33 (06):
- [5] 3-D finite element analysis for high excavated slope seepage at Three Gorges shiplocks Ren Min Chang Jiang/Yangtze River, 1996, 27 (03):
- [6] Deformation monitoring design and result analysis on high excavated slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2001, 32 (11): : 1 - 3
- [7] The Feedback Analysis of Excavated Rock Slope Rock Mechanics and Rock Engineering, 2001, 34 : 39 - 56
- [9] Comprehensive analysis of rock mechanics test results on high rock slope of TGP's lock Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 16 (03): : 29 - 33
- [10] Stability and reinforcement of upright slop of the TGP permanent shiplocks Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 643 - 647