共 34 条
- [1] Deformation monitoring design and result analysis on high excavated slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2001, 32 (11): : 1 - 3
- [3] Analysis and prediction for the deformation in deep rock mass behind high excavated rocky slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2002, 33 (04):
- [4] Practice and experimental verification of TGP's permanent shiplock slope FRONTIERS OF ROCK MECHANICS AND SUSTAINABLE DEVELOPMENT IN THE 21ST CENTURY, 2001, : 47 - 52
- [5] Excavation and reinforcement design for high slope of TGP permanent shiplock Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2000, 19 (SUPPL.): : 1071 - 1076
- [6] Rock mass deformation analysis of high excavated slope of TGP's shiplift and temporary shiplock Renmin Changjiang/Yangtze River, 30 (08): : 11 - 13
- [7] Rock deformation in off-load loose zone of high excavated slope at TGP's shiplock Renmin Changjiang/Yangtze River, 30 (04): : 4 - 6
- [9] Design of underground drainage system and its effect verification for high slope of the TGP permanent shiplock Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 738 - 741
- [10] Research on endurance of prestressed anchorage cables in TGP shiplock's high slope Yantu Lixue/Rock and Soil Mechanics, 2005, 26 (SUPPL. 2): : 126 - 130