共 50 条
- [11] Design of filling and emptying system for TGP permanent shiplocks Ren Min Chang Jiang, 10 (30):
- [12] Design of the in - situ monitoring and control system of TGP permanent shiplocks Renmin Changjiang/Yangtze River, 2001, 32 (06): : 4 - 5
- [13] Comparison of damage evolution process of high rock slope excavated by different methods Lu, W. (wblu@whu.edu.cn), 1600, Academia Sinica (32):
- [15] Excavation loosened zone and mechanical behaviors of rock mass of lock's high slope of TGP Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 16 (04): : 1 - 5
- [16] Study of Stability Influencing Factors of Excavated Anti-Dip Rock Slope KSCE Journal of Civil Engineering, 2020, 24 : 2293 - 2303
- [17] Search of key block in complex rock mass slope and support of excavated slope Wang, S.-H. (wangshuhong@mail.neu.edu.cn), 1600, Northeast University (34):
- [18] Application of inclinometer into rock slope monitoring in left hydroelectric plant of TGP Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (SUPPL.): : 1870 - 1873
- [19] Research on Stability of an Excavated High Slope ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 377 - 382
- [20] Stability analysis of a high excavated slope Geotechnical Engineering for Disaster Mitigation and Rehabilitation, 2005, : 379 - 385