共 50 条
- [41] Simulation-based assessment of batching strategies in a multi-product semiconductor wafer fabrication facility International Journal of Simulation: Systems, Science and Technology, 2005, 6 (05): : 3 - 13
- [42] Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations IEEE International Symposium on Semiconductor Manufacturing Conference, Proceedings, 1999, : 61 - 63
- [45] A study of wafer fab dispatching rules based on empirical flow time predictions TWENTY FIRST IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 1997, : 430 - 438
- [48] A fuzzy rule for job dispatching in a wafer fabrication factory-a simulation study INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (1-4): : 47 - 58
- [49] Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility WSC'01: PROCEEDINGS OF THE 2001 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2001, : 1170 - 1177