共 50 条
- [21] AUTOMATIC HEAT INPUT CONTROL IN PRODUCTION WELDING OF MEDIUM-DIAMETER ERW PIPE. Nippon Steel Technical Report, 1985, (26): : 27 - 33
- [22] DEVELOPMENT OF ACICULAR-FERRITE STEEL FOR ARCTIC-GRADE LINE PIPE. Nippon Steel Technical Report, 1979, (14): : 55 - 65
- [24] New Findings in the Optimization of Weld Quality in Heated Tool Butt Welding of Rigid PE Pipe. Plastverarbeiter, 1979, 30 (05): : 263 - 266
- [25] STAINLESS STEEL PIPE WELDING WITH NO BACKING GAS PROCEEDINGS OF THE ASME 2020 PRESSURE VESSELS & PIPING CONFERENCE (PVP2020), VOL 6, 2020,
- [26] Explosive welding steel plate to steel pipe with less damage TWENTY-FOURTH INTERNATIONAL PYROTECHNICS SEMINAR, 1998, : 571 - 578
- [27] HOMOPOLAR PULSE UPSET WELDING OF API X-60 HIGH STRENGTH LINE PIPE. Welding Journal (Miami, Fla), 1984, 63 (07): : 23 - 28
- [28] Installation and evaluation of driven steel pipe piles in Alaska soils Proceedings of the International Conference on Cold Regions Engineering, 1999, : 717 - 730
- [30] STEEL WATER PIPE DESIGN, LINING, COATING, JOINTS, AND INSTALLATION JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1973, 65 (12): : 786 - 788