共 39 条
- [1] An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem 2008 IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS, VOLS 1-5, 2008, : 1541 - +
- [4] An integrated resolution of joint production and maintenance scheduling problem in hybrid flowshop BIO-INSPIRED MODELING OF COGNITIVE TASKS, PT 1, PROCEEDINGS, 2007, 4527 : 518 - +
- [5] Resolution of joint maintenance/production scheduling by sequential and integrated strategies ARTIFICIAL NEURAL NETS PROBLEM SOLVING METHODS, PT II, 2003, 2687 : 782 - 789
- [6] Applying Ant Colony Optimization for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem 2008 3RD INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES: FROM THEORY TO APPLICATIONS, VOLS 1-5, 2008, : 1541 - +
- [7] Towards an Artificial Immune System for Scheduling Jobs and Preventive Maintenance Operations in Flowshop Problems 2014 IEEE 23RD INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (ISIE), 2014, : 1065 - 1070
- [8] A Multi-Agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT II: THIRD INTERNATIONAL CONFERENCE, ICCCI 2011, 2011, 6923 : 60 - 69
- [10] A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem INTERNATIONAL JOURNAL OF ENGINEERING, 2015, 28 (12): : 1774 - 1781