Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies

被引:23
|
作者
Benbouzid-Sitayeb F. [1 ]
Guebli S.A. [1 ]
Bessadi Y. [1 ]
Varnier C. [2 ]
Zerhouni N. [2 ]
机构
[1] Laboratoire des Méthodes de Conception de Systèmes (LMCS), Ecole Nationale Supérieure d'Informatique of Algiers (ESI ex INI), Oued Smar 16270 Algiers
[2] Automatic Control and Micro-Mechatronic Systems Department, UMR CNRS 6174-UFC/ENSMM/UTBM, FEMTO-ST Institute, Besançon 25000, 25, rue Alain Savary
关键词
Flowshop; GA; Genetic Algorithm; Joint scheduling; NEH heuristic; PM; Preventive Maintenance; Production; Taboo Search; TS;
D O I
10.1504/IJMR.2011.037912
中图分类号
学科分类号
摘要
This paper presents a comparative study on joint production and Preventive Maintenance (PM) scheduling according to the most interesting joint scheduling strategies: sequential and integrated ones regarding Flow Shop Problems (FSPs). For each strategy, we present three heuristics: Genetic Algorithms (GAs), Taboo Search (TS) and NEH heuristic. The proposed heuristics have been applied to non-standard test problems, which represent joint production and maintenance benchmark flowshop scheduling problems taken from Benbouzid et al. (2003). A comparison of the solutions yielded by the heuristics developed in this paper with the heuristic solutions given by Taillard (1993) is undertaken with respect to the minimisation of performance loss after maintenance insertion. The comparison shows that the proposed integrated GAs are clearly superior to all the analysed algorithms. Copyright © 2011 Inderscience Enterprises Ltd.
引用
收藏
页码:30 / 48
页数:18
相关论文
共 39 条
  • [1] An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem
    Benbouzid-Sitayeb, Fatima
    Ammi, Ismail
    Varnier, Christophe
    Zerhouni, Noureddine
    2008 IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS, VOLS 1-5, 2008, : 1541 - +
  • [2] A multi-agent approach for scheduling jobs and maintenance operations in the flowshop sequencing problem
    Khelifati, Si Larabi
    Tayeb, Fatima Benbouzid-Si
    INTERNATIONAL JOURNAL OF INTELLIGENT ENGINEERING INFORMATICS, 2013, 2 (01) : 47 - 70
  • [3] Considering scheduling and preventive maintenance in the flowshop sequencing problem
    Ruiz, Ruben
    Garcia-Diaz, J. Carlos
    Maroto, Concepcion
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (11) : 3314 - 3330
  • [4] An integrated resolution of joint production and maintenance scheduling problem in hybrid flowshop
    Benbouzid-Sitayeb, Fatima
    Tirchi, Mourad
    Mahloul, Abid
    BIO-INSPIRED MODELING OF COGNITIVE TASKS, PT 1, PROCEEDINGS, 2007, 4527 : 518 - +
  • [5] Resolution of joint maintenance/production scheduling by sequential and integrated strategies
    Benbouzid, F
    Varnier, C
    Zerhouni, N
    ARTIFICIAL NEURAL NETS PROBLEM SOLVING METHODS, PT II, 2003, 2687 : 782 - 789
  • [6] Applying Ant Colony Optimization for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem
    Benbouzid-Sitayeb, Fatima
    Ammi, Ismail
    Varnier, Christophe
    Zerhouni, Noureddine
    2008 3RD INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES: FROM THEORY TO APPLICATIONS, VOLS 1-5, 2008, : 1541 - +
  • [7] Towards an Artificial Immune System for Scheduling Jobs and Preventive Maintenance Operations in Flowshop Problems
    Tayeb, Fatima Benbouzid-Si
    Belkaaloul, Wahiba
    2014 IEEE 23RD INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (ISIE), 2014, : 1065 - 1070
  • [8] A Multi-Agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem
    Khelifati, Si Larabi
    Benbouzid-Sitayeb, Fatima
    COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT II: THIRD INTERNATIONAL CONFERENCE, ICCCI 2011, 2011, 6923 : 60 - 69
  • [9] Joint Scheduling of Jobs and Variable Maintenance Activities in the Flowshop Sequencing Problems: Review, Classification and Opportunities
    Assia, Sadiqi
    Ikram, El Abbassi
    Abdellah, El Barkany
    Ahmed, El Biyaali
    INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2018, 39 (39) : 170 - 190
  • [10] A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
    Mokhtari, H.
    Noroozi, A.
    Molla-Alizadeh-Zavardehi, S.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2015, 28 (12): : 1774 - 1781