Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies

被引:23
|
作者
Benbouzid-Sitayeb F. [1 ]
Guebli S.A. [1 ]
Bessadi Y. [1 ]
Varnier C. [2 ]
Zerhouni N. [2 ]
机构
[1] Laboratoire des Méthodes de Conception de Systèmes (LMCS), Ecole Nationale Supérieure d'Informatique of Algiers (ESI ex INI), Oued Smar 16270 Algiers
[2] Automatic Control and Micro-Mechatronic Systems Department, UMR CNRS 6174-UFC/ENSMM/UTBM, FEMTO-ST Institute, Besançon 25000, 25, rue Alain Savary
关键词
Flowshop; GA; Genetic Algorithm; Joint scheduling; NEH heuristic; PM; Preventive Maintenance; Production; Taboo Search; TS;
D O I
10.1504/IJMR.2011.037912
中图分类号
学科分类号
摘要
This paper presents a comparative study on joint production and Preventive Maintenance (PM) scheduling according to the most interesting joint scheduling strategies: sequential and integrated ones regarding Flow Shop Problems (FSPs). For each strategy, we present three heuristics: Genetic Algorithms (GAs), Taboo Search (TS) and NEH heuristic. The proposed heuristics have been applied to non-standard test problems, which represent joint production and maintenance benchmark flowshop scheduling problems taken from Benbouzid et al. (2003). A comparison of the solutions yielded by the heuristics developed in this paper with the heuristic solutions given by Taillard (1993) is undertaken with respect to the minimisation of performance loss after maintenance insertion. The comparison shows that the proposed integrated GAs are clearly superior to all the analysed algorithms. Copyright © 2011 Inderscience Enterprises Ltd.
引用
收藏
页码:30 / 48
页数:18
相关论文
共 39 条
  • [31] An Integrated Flow Shop Scheduling Problem of Preventive Maintenance and Degradation With an Improved NSGA-II Algorithm
    Liu, Yang
    Wang, Xiaofeng
    Zhang, Yun
    Liu, Li
    IEEE ACCESS, 2023, 11 : 3525 - 3544
  • [32] OPTIMIZING ELECTRICITY COSTS DURING INTEGRATED SCHEDULING OF JOBS AND STOCHASTIC PREVENTIVE MAINTENANCE UNDER TIME-OF-USE ELECTRICITY TARIFFS
    Assia, Sadiqi
    Ikram, El Abbassi
    Abdellah, El Barkany
    Moumen, Darcherif
    Ahmed, El Biyaali
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2019, 10 (04) : 123 - 132
  • [33] A cooperative discrete artificial bee colony algorithm with Q-learning for solving the distributed permutation flowshop group scheduling problem with preventive maintenance
    Wu, Wan-Zhong
    Sang, Hong-Yan
    Pan, Quan Ke
    Han, Qiu-Yang
    Guo, Heng-Wei
    SWARM AND EVOLUTIONARY COMPUTATION, 2025, 95
  • [34] Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling
    Jing, Zha
    Hua, Jin
    Yi, Zhu
    PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 137 - 141
  • [35] An Integrated Guided Local Search considering Human Resource Constraints for the Single-machine Scheduling problem with Preventive Maintenance
    Touat, Meriem
    Tayeb, Fatima Benbouzid-Si
    Benhamou, Belaid
    Sadeg, Lamia
    Aklil, Salima
    Karaoui, Meryem
    2019 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), 2019, : 3799 - 3804
  • [36] New Model for the Integrated Production Scheduling and Preventive Maintenance Programming Problem in an Open-Pit Iron Ore Mine: A Case Study
    Barbosa, Thalles Cesar Teixeira
    Pantuza, Guido
    MINING METALLURGY & EXPLORATION, 2024, : 3057 - 3072
  • [37] A metaheuristic algorithm co-driven by Q-learning and a learning mechanism for the distributed blocking flowshop scheduling problem with preventive maintenance and sequence-dependent setup times
    Sun, Congcong
    Sang, Hongyan
    Yuan, Li
    Gong, Jinfeng
    Zhu, Hongmin
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2025,
  • [38] Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    Moradi, E.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7169 - 7178
  • [39] An integrated approach to joint production planning and reliability-based multi-level preventive maintenance scheduling optimisation for a deteriorating system considering due-date satisfaction
    Gharoun, Hassan
    Hamid, Mahdi
    Torabi, S. Ali
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2022, 9 (04) : 489 - 511