共 39 条
- [21] A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines Journal of Scheduling, 2015, 18 : 471 - 486
- [22] A batch sizing and Joint Scheduling Problem of Jobs and Variable Maintenance Activities under energy constraints 2019 INTERNATIONAL COLLOQUIUM ON LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA), 2019,
- [23] Game theory-based integration of scheduling with flexible and periodic maintenance planning in the permutation flowshop sequencing problem Operational Research, 2018, 18 : 221 - 255
- [25] Game Theoretic Modelling of the Integrated Production and Preventive Maintenance Scheduling Problem in Permutation Flowshops 2015 54TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2015, : 5184 - 5189
- [30] Bi-objective unrelated parallel machine joint scheduling of jobs and preventive maintenance with a dynamic speed-scaling technique Materials Today: Proceedings, 2023, 72 : 3454 - 3462