Applying Ant Colony Optimization for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem

被引:0
|
作者
Benbouzid-Sitayeb, Fatima [1 ]
Ammi, Ismail [1 ]
Varnier, Christophe [2 ]
Zerhouni, Noureddine [2 ]
机构
[1] Natl Inst Comp Sci, LMCS, BP 68M, Algiers 16270, Algeria
[2] LAB, F-25000 Besancon, France
关键词
ACO; Production; Preventive maintenance; Sequential approach; Joint scheduling; Flowshop;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper a sequential resolution of the joint production and preventive maintenance scheduling problem in permutation flowshops is considered with the objective of minimizing the makespan. The proposed sequential algorithm, called SAS, consists of two steps: First the scheduling of the production jobs with Ant System algorithm (AS) by Dorigo and al. (1996) is considered. Then the insertion of the maintenance tasks is done according to several heuristics developed in previous works, taking the production scheduling as a strong constraint. Computational experiments are conducted on a large set of instances and the resulting joint ACO is presented.
引用
收藏
页码:1541 / +
页数:2
相关论文
共 50 条
  • [1] An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem
    Benbouzid-Sitayeb, Fatima
    Ammi, Ismail
    Varnier, Christophe
    Zerhouni, Noureddine
    2008 IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS, VOLS 1-5, 2008, : 1541 - +
  • [2] Considering scheduling and preventive maintenance in the flowshop sequencing problem
    Ruiz, Ruben
    Garcia-Diaz, J. Carlos
    Maroto, Concepcion
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (11) : 3314 - 3330
  • [3] Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies
    Benbouzid-Sitayeb F.
    Guebli S.A.
    Bessadi Y.
    Varnier C.
    Zerhouni N.
    International Journal of Manufacturing Research, 2011, 6 (01) : 30 - 48
  • [4] An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
    Tavares Neto, R. F.
    Godinho Filho, M.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1286 - 1293
  • [5] A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
    Mokhtari, H.
    Noroozi, A.
    Molla-Alizadeh-Zavardehi, S.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2015, 28 (12): : 1774 - 1781
  • [6] Scheduling a flowshop problem with fuzzy processing times using ant colony optimization
    Kilic, Sezgin
    Kahraman, Cengiz
    APPLIED ARTIFICIAL INTELLIGENCE, 2006, : 449 - +
  • [7] Ant colony optimization technique for the sequence-dependent flowshop scheduling problem
    Mohammad Mirabi
    The International Journal of Advanced Manufacturing Technology, 2011, 55 : 317 - 326
  • [8] Ant colony optimization technique for the sequence-dependent flowshop scheduling problem
    Mirabi, Mohammad
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (1-4): : 317 - 326
  • [9] An integrated resolution of joint production and maintenance scheduling problem in hybrid flowshop
    Benbouzid-Sitayeb, Fatima
    Tirchi, Mourad
    Mahloul, Abid
    BIO-INSPIRED MODELING OF COGNITIVE TASKS, PT 1, PROCEEDINGS, 2007, 4527 : 518 - +
  • [10] Applying the ant colony optimization algorithm to the spatial cluster scheduling problem
    Xiao, JT
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 1341 - 1346