共 50 条
- [1] An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem 2008 IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS, VOLS 1-5, 2008, : 1541 - +
- [5] A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem INTERNATIONAL JOURNAL OF ENGINEERING, 2015, 28 (12): : 1774 - 1781
- [6] Scheduling a flowshop problem with fuzzy processing times using ant colony optimization APPLIED ARTIFICIAL INTELLIGENCE, 2006, : 449 - +
- [7] Ant colony optimization technique for the sequence-dependent flowshop scheduling problem The International Journal of Advanced Manufacturing Technology, 2011, 55 : 317 - 326
- [8] Ant colony optimization technique for the sequence-dependent flowshop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (1-4): : 317 - 326
- [9] An integrated resolution of joint production and maintenance scheduling problem in hybrid flowshop BIO-INSPIRED MODELING OF COGNITIVE TASKS, PT 1, PROCEEDINGS, 2007, 4527 : 518 - +
- [10] Applying the ant colony optimization algorithm to the spatial cluster scheduling problem PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 1341 - 1346