Optimization of crane scheduling in slab yard based on cycle simulation

被引:0
|
作者
机构
[1] Zhao, Ning
[2] Du, Yan-Hua
[3] Dong, Shao-Hua
[4] Li, Liang
来源
Zhao, N. | 1600年 / Systems Engineering Society of China卷 / 32期
关键词
Constrained optimization - Cranes - Steelmaking - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Crane scheduling in slab yard is very important to tempo and efficiency of steel production. The optimization of crane scheduling is constrained by working zone, working process and crane interference. The process of optimization is affected by stochastic and whether the optimize result is satisfied is fuzzy. Cycle simulation is designed orienting this problem, thus optimization result can be got by multi-class fuzzy evaluation and cycle transform between as-is simulation model and to be simulation model. Agent technique is used to design simulation object in slab yard, simulation event and simulation logic are defined. An example of simulation application in a steel plant in China showed cycle simulation method is useful to crane scheduling in slab yard.
引用
收藏
相关论文
共 50 条
  • [1] A Crane Guidance System with Scheduling Optimization Technology in a Steel Slab Yard
    Kuyama, Shuji
    Tomiyama, Shinji
    ISIJ INTERNATIONAL, 2016, 56 (05) : 820 - 827
  • [2] Integrated optimization of storage location assignment and crane scheduling in an unmanned slab yard
    Peng, Gongzhuang
    Wu, Youqi
    Zhang, Chunjiang
    Shen, Weiming
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 161
  • [3] On the Optimization of Yard Crane Scheduling in a Container Terminal Based on GATS
    Hu Yanhong
    Sun Junqing
    Han Mei
    Liu Fenglian
    Yang Peng
    Feng Meiling
    PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 5473 - 5477
  • [4] A Branch and Price Algorithm for Crane Assignment and Scheduling in Slab Yard
    Wang, Xu
    Zhou, MengChu
    Zhao, Qiuhong
    Liu, Shixin
    Guo, Xiwang
    Qi, Liang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (03) : 1122 - 1133
  • [5] Modeling and Solution of Crane Scheduling in Slab Yard of Steelmaking Plant
    Yang, Liying
    DanNiu
    Liu, Minghao
    Li, Qi
    Yang, Jun
    2022 41ST CHINESE CONTROL CONFERENCE (CCC), 2022, : 5847 - 5852
  • [6] Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time
    Wang, Xu
    Zhao, Qiuhong
    Liu, Shixin
    Wang, Jia
    Qi, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (05) : 1707 - 1724
  • [7] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    Hsu, Hsien-Pin
    Chou, Chien-Chang
    Wang, Chia-Nan
    IEEE Access, 2022, 10
  • [8] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    HSU, HSIEN-PIN
    CHOU, CHIEN-CHANG
    WANG, CHIA-NAN
    IEEE ACCESS, 2022, 10 : 64650 - 64670
  • [9] Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
    Hsu, Hsien-Pin
    Wang, Chia-Nan
    Fu, Hsin-Pin
    Dang, Thanh-Tuan
    MATHEMATICS, 2021, 9 (18)
  • [10] Integrated simulation and optimisation of scheduling yard crane and yard truck in loading operation
    Cao, Pengliang
    Jiang, Guiyan
    Huang, Senjia
    Ma, Lingqi
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2020, 12 (03) : 230 - 250