Optimization of crane scheduling in slab yard based on cycle simulation

被引:0
|
作者
机构
[1] Zhao, Ning
[2] Du, Yan-Hua
[3] Dong, Shao-Hua
[4] Li, Liang
来源
Zhao, N. | 1600年 / Systems Engineering Society of China卷 / 32期
关键词
Constrained optimization - Cranes - Steelmaking - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Crane scheduling in slab yard is very important to tempo and efficiency of steel production. The optimization of crane scheduling is constrained by working zone, working process and crane interference. The process of optimization is affected by stochastic and whether the optimize result is satisfied is fuzzy. Cycle simulation is designed orienting this problem, thus optimization result can be got by multi-class fuzzy evaluation and cycle transform between as-is simulation model and to be simulation model. Agent technique is used to design simulation object in slab yard, simulation event and simulation logic are defined. An example of simulation application in a steel plant in China showed cycle simulation method is useful to crane scheduling in slab yard.
引用
收藏
相关论文
共 50 条
  • [21] Simulation-based Optimization on Quay Crane Scheduling of Container Terminals
    Li Haoyuan
    Sun Qi
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 1135 - 1139
  • [22] Multi-mode logistics optimization in slab yard of steel plant based on simulation
    Li, Lin
    Zhao, Ning
    Dong, Shaohua
    ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 1809 - 1813
  • [23] Quay crane and yard truck dual-cycle scheduling with mixed storage strategy
    Zhu, Shengyan
    Tan, Zheyi
    Yang, Zhiyuan
    Cai, Lecai
    ADVANCED ENGINEERING INFORMATICS, 2022, 54
  • [24] The integrated yard truck and yard crane scheduling problem: Blenders' decomposition-based methods
    Cao, Jin Xin
    Lee, Der-Horng
    Chen, Jiang Hang
    Shi, Qixin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (03) : 344 - 353
  • [25] Integrated Scheduling of Dual-cycle AGV and Yard Crane at Automated Container Terminal
    Tian Y.
    Zhou Q.
    Zhu B.-F.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2020, 20 (04): : 216 - 223and243
  • [26] Optimization of yard crane scheduling, using particle swarm optimization with genetic algorithm operators (PSOGAO)
    Kumar, M. Manoj
    Omkar, S. N.
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2008, 67 (05): : 335 - 339
  • [27] Yard crane scheduling in port container terminals
    Ng, WC
    Mak, KL
    APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) : 263 - 276
  • [28] THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK
    Ting, Shang Xiao
    Xin, Cao Jin
    Bin, Jia
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2271 - 2277
  • [29] Scheduling Yard Cranes Considering Crane Interference
    Speer, Ulf
    John, Gerlinde
    Fischer, Kathrin
    COMPUTATIONAL LOGISTICS, 2011, 6971 : 321 - +
  • [30] Mathematical model for crane scheduling in mixed yard
    Han, Huihui
    Mi, Liying
    Yang, Tao
    Luo, Xin
    4TH ANNUAL INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATION AND SENSOR NETWORK (WCSN 2017), 2018, 17