共 50 条
- [33] A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem 2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
- [35] Optimization of continuous berth and quay crane allocation problem in seaport container terminal Int. Conf. Intelligent Comput. Technol. Autom., ICICTA, 1600, (229-233):
- [36] Optimization of continuous berth and quay crane allocation problem in seaport container terminal ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL III, PROCEEDINGS, 2009, : 229 - 233
- [37] Robust Optimisation for an Integrated Model of Berth and Quay Crane Assignment at Maritime Container Terminals Respecting Uncertain Numbers of Quay Cranes COMPUTATIONAL LOGISTICS, ICCL 2024, 2024, 15168 : 208 - 222
- [38] Scheduling of Quay Crane at Container Terminals based on Ant Colony Algorithm 2011 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE (ICMI 2011), PT 2, 2011, 4 : 586 - 592