Model for disruption management of berth allocation & quay crane scheduling in container terminals

被引:0
|
作者
Zeng, Qing-Cheng [1 ,2 ]
Hu, Xiang-Pei [1 ]
Yang, Zhong-Zhen [2 ]
机构
[1] Institute of Systems Engineering, Dalian University of Technology, Dalian 116023, China
[2] School of Transport Management, Dalian Maritime University, Dalian 116026, China
关键词
Transfer cases (vehicles) - Scheduling - Railroad yards and terminals - Computational efficiency - Cranes - Port terminals;
D O I
暂无
中图分类号
学科分类号
摘要
In order to solve the difficult problem that unexpected events, which may make the original schedule infeasible, occur occasionally in container terminals, a disruption management model for berth and quay crane scheduling was developed by the methodology of disruption management. This model measured disruptions from three aspects: Operation cost, vessel delay cost and schedule deviation. To solve the disruption management model, a simulation optimization approach was proposed, and algorithms based on local rescheduling and tabu search were designed. Finally, numerical experiments were provided to illustrate the validity of the proposed model and algorithms. Results indicate that local rescheduling based algorithm can improve the computation efficiency comparing to full rescheduling based algorithm. Moreover, the disruption management model considers the benefit of different parties, thus increases the scientific of disruption recovery schedule.
引用
收藏
页码:2026 / 2035
相关论文
共 50 条
  • [21] DISRUPTION MANAGEMENT MODEL AND ITS ALGORITHMS FOR BERTH ALLOCATION PROBLEM IN CONTAINER TERMINALS
    Zeng, Qingcheng
    Hu, Xiangpei
    Wang, WenJuan
    Fang, Yan
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2011, 7 (5B): : 2763 - 2773
  • [22] A new continuous berth allocation and quay crane assignment model in container terminal
    Han XiaoLong
    Gong, Xing
    Jo, Jungbok
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 89 : 15 - 22
  • [23] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
    Qian Jifeng
    Zhu Xiaoning
    Liu Yongjun
    APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
  • [24] Integrated continuous berth allocation and quay crane assignment and scheduling problem with time-dependent physical constraints in container terminals
    Malekahmadi, Amirsalar
    Alinaghian, Mehdi
    Hejazi, Seyed Reza
    Saidipour, Mohammad Ali Assl
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 147
  • [25] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [26] Berth Allocation Problem with Quay Crane Assignment for Container Terminals Based on Rolling-Horizon Strategy
    Xiao, Ling
    Hu, Zhi-Hua
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [27] Integration of Berth Allocation and Quay Crane Assignment in Tidal Container Ports
    陆志强
    吴文
    韩笑乐
    NIRAVONG Juliane
    Journal of Donghua University(English Edition), 2015, 32 (04) : 559 - 564
  • [28] A quay crane assignment approach for berth allocation problem in container terminal
    Hu, Zhi-Hua
    2010 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY AND SECURITY INFORMATICS (IITSI 2010), 2010, : 17 - 21
  • [29] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [30] Real-Time Disruption Recovery for Integrated Berth Allocation and Crane Assignment in Container Terminals
    Li, Meng Ze
    Jin, Jian Gang
    Lu, Chun Xia
    TRANSPORTATION RESEARCH RECORD, 2015, (2479) : 49 - 59