A Whole-Process Data Processing Method for Tunnel Seismic Geological Prediction Ahead of Tunnel Faces

被引:0
|
作者
Cuifa Shao [1 ]
Yanning Wang [2 ]
Yunfu Jia [3 ]
Feng Liang [3 ]
Chengyuan Pei [4 ]
Peng Guan [1 ]
Yuyong Jiao [1 ]
机构
[1] Faculty of Engineering, China University of Geosciences
[2] Tianjin Municipal Engineering Design & Research Institute
[3] Xinjiang Survey and Design Institute for Water Resources and Hydropower
[4] Xinjiang Water Conservancy Development and Construction Group Co,
关键词
D O I
暂无
中图分类号
U452.11 [];
学科分类号
摘要
<正>0 INTRODUCTION The forecast of abnormal geological structures(e.g., fracture zones, faults, aquifers and karst) during tunnel drilling remains a demanding task: detecting faults and other geological features impacting the area ahead of the tunnel is crucial for safety and engineering considerations(Meng et al., 2024; Wu et al., 2024).
引用
收藏
页码:333 / 338
页数:6
相关论文
共 50 条
  • [21] An interpretation model of GPR point data in tunnel geological prediction
    He Yu-yao
    Li Bao-qi
    Guo Yuan-shu
    Wang Teng-na
    Zhu Ya
    EIGHTH INTERNATIONAL CONFERENCE ON GRAPHIC AND IMAGE PROCESSING (ICGIP 2016), 2017, 10225
  • [22] Evaluation of geological conditions ahead of TBM tunnel using wireless seismic reflector tracing system
    Yokota, Yasuhiro
    Yamamoto, Takuji
    Shirasagi, Suguru
    Koizumi, Yu
    Descour, Jozef
    Kohlhaas, Matt
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 85 - 90
  • [23] The comparison of different seismic sources in the new method for seismic reflection survey ahead of a tunnel face
    Shimizu, Nobuyuki
    Murayama, Hideyuki
    Asada, Hiroaki
    Hagiwara, Masamichi
    Geophysical Solutions for Environment and Engineering, Vol 1 and 2, 2006, : 58 - 63
  • [24] A comparison of the horizontal sound probing method and the tunnel seismic prediction method
    Wu, Zhi
    Liu, Bingxing
    Liao, Yankai
    Modern Tunnelling Technology, 2013, 50 (04) : 50 - 55
  • [25] Research on the interference elimination method of GPR signal for tunnel geological prediction
    Liu Z.-H.
    Wu Y.-F.
    Liu B.-D.
    Liu M.-M.
    Lan R.-Y.
    Sun H.-F.
    Lan, Ri-Yan (47573043@qq.com), 1600, Science Press (42): : 390 - 398
  • [26] Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data
    Yamamoto, T
    Shirasagi, S
    Yamamoto, S
    Mito, Y
    Aoki, K
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2003, 18 (2-3) : 213 - 221
  • [27] Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data
    Yamamoto, T
    Shirasagi, S
    Yamamoto, S
    Mito, Y
    Aoki, K
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 213 - 218
  • [28] Prediction of geological conditions for a tunnel boring machine using big operational data
    Zhang, Qianli
    Liu, Zhenyu
    Tan, Jianrong
    AUTOMATION IN CONSTRUCTION, 2019, 100 : 73 - 83
  • [29] The tunnel seismic prediction method and its impact on logistic optimisation in tunnelling
    Dickmann, T
    Awasthi, RK
    SITE CHARACTERISATION PRACTICE, 2000, : 203 - 207
  • [30] Tunnel Seismic Detection for Tunnel Boring Machine by Joint Active and Passive Source Method and Imaging Advanced Prediction
    Lu, Xinglin
    Wang, Jun
    Wang, Wei
    Liu, Xuhua
    Yang, Chao
    Liu, Yufeng
    Fu, Zhihong
    Lithosphere, 2024, 2024 (04) : 1 - 14