A Whole-Process Data Processing Method for Tunnel Seismic Geological Prediction Ahead of Tunnel Faces

被引:0
|
作者
Cuifa Shao [1 ]
Yanning Wang [2 ]
Yunfu Jia [3 ]
Feng Liang [3 ]
Chengyuan Pei [4 ]
Peng Guan [1 ]
Yuyong Jiao [1 ]
机构
[1] Faculty of Engineering, China University of Geosciences
[2] Tianjin Municipal Engineering Design & Research Institute
[3] Xinjiang Survey and Design Institute for Water Resources and Hydropower
[4] Xinjiang Water Conservancy Development and Construction Group Co,
关键词
D O I
暂无
中图分类号
U452.11 [];
学科分类号
摘要
<正>0 INTRODUCTION The forecast of abnormal geological structures(e.g., fracture zones, faults, aquifers and karst) during tunnel drilling remains a demanding task: detecting faults and other geological features impacting the area ahead of the tunnel is crucial for safety and engineering considerations(Meng et al., 2024; Wu et al., 2024).
引用
收藏
页码:333 / 338
页数:6
相关论文
共 50 条
  • [31] Application of comprehensive geophysical prospecting method in advance geological prediction of limestone tunnel
    Chen, Wu
    Li, Junjie
    Zheng, Huihua
    2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
  • [32] Tunnel surrounding rock classification forecast based on the geological advanced prediction system in seismic area
    Ren, Tao
    Jiang, Deyi
    Chen, Jie
    Guo, Wei
    Ren, Song
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 910 - 915
  • [33] Experimental research on 3D geological directional seismic prediction during tunnel construction
    Lou G.
    Sun Z.
    Man L.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2020, 39 : 2733 - 2740
  • [34] Comparison between electrical resistivity tomography and tunnel seismic prediction 303 methods for detecting the water zone ahead of the tunnel face: A case study
    Dastanboo, Nima
    Li, Xiao-Qing
    Gharibdoost, Hamed
    OPEN GEOSCIENCES, 2020, 12 (01) : 1094 - 1104
  • [35] Inverting continuous in-tunnel passive seismic data for velocity structure ahead of the TBM cutterhead
    Nilot, Enhedelihai Alex
    Li, Yunyue Elita
    Fang, Gang
    Tan, Yun Zhou
    Cheng, Arthur
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 151
  • [36] Verification of a prediction method for ground conditions ahead of a tunnel face by means of inclination monitoring
    Sakai, Kazuo
    Tani, Takuya
    Aoki, Tomoyuki
    Ohtsu, Hiroyasu
    GEOMECHANICS AND GEODYNAMICS OF ROCK MASSES, 2018, : 583 - 590
  • [37] Verification of a prediction method for ground conditions ahead of a tunnel face by means of inclination monitoring
    Sakai, Kazuo
    Tani, Takuya
    Aoki, Tomoyuki
    Ohtsu, Hiroyasu
    GEOMECHANICS AND GEODYNAMICS OF ROCK MASSES (EUROCK2018), VOLS 1 AND 2, 2018, : 1297 - 1304
  • [38] Seismic Stability Analysis of Tunnel Faces in Heterogeneous and Anisotropic Soils Using Modified Pseudodynamic Method
    Chen, Xi
    Zhang, Kun
    Wang, Wei
    SUSTAINABILITY, 2023, 15 (14)
  • [39] Geostatistical method for inferring RMR ahead of tunnel face excavation using dynamically exposed geological information
    Chen, Jianqin
    Li, Xiaojun
    Zhu, Hehua
    Rubin, Yoram
    ENGINEERING GEOLOGY, 2017, 228 : 214 - 223
  • [40] Prediction of Conductive Anomalies Ahead of the Tunnel by the 3D-Resitivity Forward Modeling in the Whole Space
    Hu, Daiming
    Tezkan, Buelent
    Yue, Mingxin
    Yang, Xiaodong
    Wu, Xiaoping
    Zhou, Guanqun
    GEOFLUIDS, 2021, 2021