Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data

被引:0
|
作者
Yamamoto, T
Shirasagi, S
Yamamoto, S
Mito, Y
Aoki, K
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In tunnel excavation by TBM, the ground condition ahead of and near the tunnel face is difficult to grasp because the face cannot be observed during tunnel driving. Because of this fact, it has been impossible to fully achieve the high-speed excavation capability of the TBM in ground having complex conditions. Therefore, the authors developed TBM Excavation Control System, the purpose of which is to grasp quickly and precisely, and in real time, the geological condition ahead of and surrounding the tunnel face. The special feature of this system is that the geological condition ahead of the TBM can be predicted with good precision by analyzing by geostatistical techniques both drill logging data from pilot boring and TBM driving data obtained during excavation.
引用
收藏
页码:213 / 218
页数:6
相关论文
共 50 条
  • [1] Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data
    Yamamoto, T
    Shirasagi, S
    Yamamoto, S
    Mito, Y
    Aoki, K
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2003, 18 (2-3) : 213 - 221
  • [2] An ANN to Predict Ground Condition ahead of Tunnel Face using TBM Operational Data
    Jung, Jee-Hee
    Chung, Heeyoung
    Kwon, Young-Sam
    Lee, In-Mo
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (07) : 3200 - 3206
  • [3] An ANN to Predict Ground Condition ahead of Tunnel Face using TBM Operational Data
    Jee-Hee Jung
    Heeyoung Chung
    Young-Sam Kwon
    In-Mo Lee
    KSCE Journal of Civil Engineering, 2019, 23 : 3200 - 3206
  • [4] A New Evaluation Method for the Uniaxial Compressive Strength ahead of the Tunnel Face Based on the Driving Data and Specification Parameters of TBM
    Wu, Yuexiu
    Ma, Chishuai
    Tan, Xianjun
    Yang, Dianseng
    Tian, Hongming
    Yang, Jianping
    SHOCK AND VIBRATION, 2019, 2019
  • [5] Prediction of the rock properties ahead of the tunnel face in TBM tunnels by geostatistical simulation technique
    Aoki, K
    Mito, Y
    Yamamoto, T
    Shirasagi, S
    ENVIRONMENTAL ROCK ENGINEERING, 2003, : 245 - 250
  • [6] Systems for forward prediction of geological condition ahead of the tunnel face
    Yamamoto, T
    Shirasagi, S
    Inou, M
    Aoki, K
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 237 - 242
  • [7] Geostatistical method for inferring RMR ahead of tunnel face excavation using dynamically exposed geological information
    Chen, Jianqin
    Li, Xiaojun
    Zhu, Hehua
    Rubin, Yoram
    ENGINEERING GEOLOGY, 2017, 228 : 214 - 223
  • [8] Evaluation of geological conditions ahead of TBM tunnel using wireless seismic reflector tracing system
    Yokota, Yasuhiro
    Yamamoto, Takuji
    Shirasagi, Suguru
    Koizumi, Yu
    Descour, Jozef
    Kohlhaas, Matt
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 85 - 90
  • [9] GEOLOGICAL PROGNOSIS AHEAD OF A TUNNEL FACE
    HASEGAWA, M
    USUI, M
    GOTOH, K
    ENGINEERING GEOLOGY, 1993, 35 (3-4) : 229 - 235
  • [10] Correlation with various systems for forward prediction of geological condition ahead of the tunnel face
    Yamamoto, T
    Shirasagi, S
    Inou, M
    Aoki, K
    ROCK MECHANICS: A CHALLENGE FOR SOCIETY, 2001, : 393 - 398