Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data

被引:0
|
作者
Yamamoto, T
Shirasagi, S
Yamamoto, S
Mito, Y
Aoki, K
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In tunnel excavation by TBM, the ground condition ahead of and near the tunnel face is difficult to grasp because the face cannot be observed during tunnel driving. Because of this fact, it has been impossible to fully achieve the high-speed excavation capability of the TBM in ground having complex conditions. Therefore, the authors developed TBM Excavation Control System, the purpose of which is to grasp quickly and precisely, and in real time, the geological condition ahead of and surrounding the tunnel face. The special feature of this system is that the geological condition ahead of the TBM can be predicted with good precision by analyzing by geostatistical techniques both drill logging data from pilot boring and TBM driving data obtained during excavation.
引用
收藏
页码:213 / 218
页数:6
相关论文
共 50 条
  • [31] A Whole-Process Data Processing Method for Tunnel Seismic Geological Prediction Ahead of Tunnel Faces
    Shao, Cuifa
    Wang, Yanning
    Jia, Yunfu
    Liang, Feng
    Pei, Chengyuan
    Guan, Peng
    Jiao, Yuyong
    JOURNAL OF EARTH SCIENCE, 2025, 36 (01) : 333 - 338
  • [32] Seismic velocity prediction ahead of the tunnel face using seismic refraction with a source in the tunnel
    Takahashi, T
    Hayashi, K
    Contribution of Rock Mechanics to the New Century, Vols 1 and 2, 2004, : 109 - 114
  • [33] Imaging and characterizing fractures ahead of tunnel face using in-tunnel HSP method
    Inazaki, T
    Kurahashi, T
    PROCEEDINGS OF THE SYMPOSIUM ON THE APPLICATION OF GEOPHYSICS TO ENGINEERING AND ENVIRONMENTAL PROBLEMS, 1996, : 597 - 604
  • [34] Inverting continuous in-tunnel passive seismic data for velocity structure ahead of the TBM cutterhead
    Nilot, Enhedelihai Alex
    Li, Yunyue Elita
    Fang, Gang
    Tan, Yun Zhou
    Cheng, Arthur
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 151
  • [35] The Whole-Space Modeling of the Hazardous Geological Body ahead of the Tunnel Face by the Transient Electromagnetic Method
    Li, Hua-ming
    Zhang, Ji-feng
    Shang, Tian-xin
    Hu, Zhi-ping
    Shi, Yu
    Cai, Le-jun
    Huang, Ping
    JOURNAL OF ENVIRONMENTAL AND ENGINEERING GEOPHYSICS, 2022, 27 (02) : 89 - 102
  • [36] Evaluation of the driving safety in a continuous tunnel by using the driving simulator
    Yoo, Jin-Young
    Kawahara, Yukihiro
    Enokida, Atsuyuki
    Washio, Satoshi
    Tamaoki, Yasuo
    Shinji, Masato
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2014, : 419 - 422
  • [38] Using tunnel boring data to augment the geological model
    Newman, T. G.
    Yuan, L. F. V.
    O'Keeffe, L. C.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2010, 163 (03) : 157 - 166
  • [39] A simulation using a hybrid method for predicting fault zones ahead of a tunnel face
    Lee, IM
    Kim, DH
    INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2003, 27 (02) : 147 - 158
  • [40] Anomaly Prediction Ahead Tunnel Face Using Tunnel Electrical Resistivity Prospecting System (TEPS) in Danyang
    Hong, Chang-Ho
    Cho, Gye-Chun
    Hong, Eun-Soo
    Baak, Seng-Hyoung
    Ryu, Hee-Hwan
    ISRM EUROPEAN ROCK MECHANICS SYMPOSIUM EUROCK 2017, 2017, 191 : 855 - 861