共 50 条
- [43] NEW METHOD OF DETERMINATION OF METHANE AND HYDROGEN IN MARINE WATER AT THE EXPEDITION CONDITIONS GEOKHIMIYA, 1988, (11): : 1665 - 1668
- [45] Research on the Method of Temporary Prestressing to Regulate the Stress in the Section during the Construction of the Main Arch Ring of the Cantilever Cast Arch Bridge APPLIED SCIENCES-BASEL, 2022, 12 (19):
- [47] Sub-regional and subsection linear control method during the construction of main cables strands for long-span suspension bridge Chang'an Daxue Xuebao (Ziran Kexue Ban)/Journal of Chang'an University (Natural Science Edition), 2015, 35 (05): : 57 - 64
- [48] A New Construction Method for Deeply Buried Metro Station in Rich Water Strata PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY AND ENVIRONMENTAL SCIENCE 2015, 2015, 31 : 156 - 159
- [50] New risk analysis method based on Bayesian network for hanging basker system of multi-tower cable-stayed bridge Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (04): : 865 - 873