New construction method for main tower and substructure of marine bridge at great water depth

被引:0
|
作者
机构
来源
Sekimoto, Hisashi | 2000年 / Mitsubishi Heavy Industries, Tokyo, Japan卷 / 37期
关键词
Accident prevention - Bearing capacity - Pile foundations - Steel construction - Steel pipe - Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
To construct a cross-strait bridge with a center span exceeding 2 000 m, such as the bridges in Ise Bay, the Kitan Strait, Tokyo Bay, or the Second Kanmon Bridge, the design and the construction must be developed so as to minimize the construction cost at water depths exceeding 100 m. We propose a low-cost construction method using `hybrid main tower structure, jacket and steel-pipe-pile foundation.' The structure consists of a hybrid main tower using CFT (Concrete Filled Tube), a jacket in the sea, and a steel-pipe-pile foundation in the sea bed, rather than the conventional construction of main tower and lay-down caisson, which is expensive and difficult to construct for marine bridges. We studied the bearing capacity of the steel-pipe-pile, the strength of the joint between the jacket and piles, and the ultimate capacity of the main tower. We also calculated the seismic safety of the overall structure, ensuring the structure's potential and safety.
引用
收藏
相关论文
共 50 条
  • [21] New electroantennography method on a marine shrimp in water
    Machon, Julia
    Ravaux, Juliette
    Zbinden, Magali
    Lucas, Philippe
    JOURNAL OF EXPERIMENTAL BIOLOGY, 2016, 219 (23): : 3696 - 3700
  • [22] New Design Technique for Self-anchored Suspension Bridge of Spatial Main Cable and Single Column Tower
    Zheng, Shuiqing
    Journal of Railway Engineering Society, 2019, 36 (04) : 37 - 42
  • [23] Research on Calculation Method of Main Cable System Construction Control of Long Span Suspension Bridge
    梅葵花
    孙胜江
    何湘峰
    公路, 2010, (10) : 1 - 5
  • [24] Calculation method of main cable system construction control of long-span suspension bridge
    Huang, Pingming
    Mei, Kuihua
    Xu, Yue
    Xi'an Gonglu Xueyuan Xuebao/Journal of Xi'an Highway Transportation University, 2000, 20 (04): : 19 - 22
  • [25] Application of the Kalman's filtering method to the suspension bridge construction control - the main cable erecting
    Hua, Yingchun
    Zhang, Jinquan
    Gongku Jiaotong Keji/Journal of Highway and Transportation Research and Development, 16 (02): : 35 - 38
  • [26] POLAR GAS PROPOSES NEW MARINE CONSTRUCTION METHOD.
    Anon
    Gas world and gas journal, 1980, 185 (4736): : 186 - 187
  • [27] New Construction Method of Marine Cofferdam on the Soft Ground in Tideland
    Liu, Aimin
    Yan, Shuwang
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1785 - +
  • [28] Construction techniques for foundation of main pier No.3 of new baishatuo changjiang river bridge
    Zhou, Gong-Jian
    Bridge Construction, 2015, 45 (01) : 1 - 5
  • [29] Cooling tower for a pharmaceutical process cooling water system - New construction using construction management project delivery
    Parolise, Amanda
    Engineered Systems, 2019, 36 (11):
  • [30] Stress Monitoring on Cantilever Construction Stage of the Main Bridge of South-to-North Water Transfers Canal
    Du, Qing
    Yang, Yipeng
    Li, Xiaohui
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1213 - +