共 50 条
- [31] Rotation Adaptive Control Method for Incremental Launching Construction of Main Girder in Bridge with Complex Vertical Curves Bridge Construction, 2022, 52 (02): : 53 - 59
- [32] Analysis of construction of main arch rib concrete of Nanpan river bridge using fastening stay method 1600, Wuhan Bridge Research Institute (46):
- [33] Sampling method and pore water pressure measurement in the great depth (-400m) CHALLENGES AND INNOVATIONS IN GEOTECHNICS: PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1, 2013, : 607 - 610
- [34] A new computing method for the tube wall thickness in furnace of marine main boiler ADVANCES IN ENERGY SCIENCE AND EQUIPMENT ENGINEERING, 2015, : 2483 - 2487
- [35] Temperature-control method for jacket cooling water of main marine diesel engine Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2006, 27 (SUPPL. 2): : 642 - 646
- [36] Aqueduct fingerprinting in a water main of Pompeii - A method for studying the construction history of an ancient water distribution system CURA AQUARUM IN SICILIA: ANNUAL PAPERS ON CLASSICAL ARCHAEOLOGY, SUPPLEMENT 6 - 2000, 2001, : 163 - 169
- [39] Method for Stress Analysis of Main Girder During Construction of Π-Shaped Composite Girder Cable-Stayed Bridge Bridge Construction, 2019, 49 (03): : 63 - 68
- [40] A New Method for Vertical Bending Stiffness Evaluation of Floating Single-tower Cable-stayed Bridge Kang, Houjun (khjun@hnu.edu.cn), 1600, Hunan University (44): : 126 - 134