New construction method for main tower and substructure of marine bridge at great water depth

被引:0
|
作者
机构
来源
Sekimoto, Hisashi | 2000年 / Mitsubishi Heavy Industries, Tokyo, Japan卷 / 37期
关键词
Accident prevention - Bearing capacity - Pile foundations - Steel construction - Steel pipe - Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
To construct a cross-strait bridge with a center span exceeding 2 000 m, such as the bridges in Ise Bay, the Kitan Strait, Tokyo Bay, or the Second Kanmon Bridge, the design and the construction must be developed so as to minimize the construction cost at water depths exceeding 100 m. We propose a low-cost construction method using `hybrid main tower structure, jacket and steel-pipe-pile foundation.' The structure consists of a hybrid main tower using CFT (Concrete Filled Tube), a jacket in the sea, and a steel-pipe-pile foundation in the sea bed, rather than the conventional construction of main tower and lay-down caisson, which is expensive and difficult to construct for marine bridges. We studied the bearing capacity of the steel-pipe-pile, the strength of the joint between the jacket and piles, and the ultimate capacity of the main tower. We also calculated the seismic safety of the overall structure, ensuring the structure's potential and safety.
引用
收藏
相关论文
共 50 条
  • [1] Engineering the Tower and Main Span Construction of Stonecutters Bridge
    Morgenthal, Guido
    Sham, Robin
    West, Brian
    JOURNAL OF BRIDGE ENGINEERING, 2010, 15 (02) : 144 - 152
  • [3] Accurate nonlinear analysis of tower and cable in construction of main cable for suspension bridge
    Chen, Changsong
    Su, Long
    Yan, Donghuang
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2007, 42 (01): : 44 - 48
  • [4] New construction method of the coolong tower.
    Barck, I
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1925, 69 : 18 - 20
  • [5] Comprehensive introduction of the main tower foundation construction technique of Wenzhou Oujiang No.2 bridge north channel bridge
    Zuo, Mingfu
    Shuiyun Gongcheng/Port & Waterway Engineering, (12): : 35 - 39
  • [6] Construction and building of the new Osthafen Bridge in Frankfurt/Main, Germany
    Springer, Johannes
    Dieter, Alwin
    Schidzig, Ruediger
    Kowalski, Peter
    STAHLBAU, 2014, 83 (10) : 722 - 730
  • [7] Proposed New Analytical Method of Tower Load in Large-Span Arch Bridge Cable Lifting Construction
    Huang, Qian
    Wu, Xiaoguang
    Zhang, Yunfei
    Ma, Min
    APPLIED SCIENCES-BASEL, 2022, 12 (18):
  • [8] All-precast substructure accelerates construction of prestressed concrete bridge in New Hampshire
    Stamnas, PE
    Whittemore, MD
    PCI JOURNAL, 2005, 50 (03): : 26 - +
  • [9] Design, testing and construction of rock socket for tower foundations of the new Carquinez Bridge
    Chang, CY
    Legaspi, DE
    Ma, YZ
    Chin, CC
    Orsolini, GI
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2, 2004, (126): : 1229 - 1238
  • [10] New Method for Calculating Main Cable of Suspension Bridge
    Deng, Xiaokang
    Xu, Gongyi
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (05): : 133 - 141