Analysis of Railway Bridge Girder Installation and Construction Technology-Based on BIM Technology

被引:0
|
作者
Ke L. [1 ]
Wan R. [1 ]
机构
[1] Southwest Jiaotong University Hope College, Sichuan, Chengdu
关键词
BIM technology; Bridge girder plate installation; Construction simulation; Deviation warning; Lean management;
D O I
10.2478/amns-2024-1242
中图分类号
学科分类号
摘要
The emergence of BIM technology has caused changes in the field of construction, which is of great significance to improving the construction technology and management level of roads and bridges. In this paper, the overall framework of the railroad bridge BIM model is constructed by utilizing several BIM software to display its corresponding geometric construction information and line information. Based on the relevant information, construction simulation technology is combined with BIM technology to propose a lean management model for a railroad bridge construction site. Specifically, it first checks the mechanical properties of the bridge plate to ensure the safety of its installation, and then optimizes the progress of the construction phase under the constraints of the construction site, realizes the deviation warning, and ensures the optimal completion of the construction project. The results show that the paving layer connection structure has an optimal load transfer effect in the range of 0-502kN. However, cracking at the critical point of the pressure plate can result in plastic deformation before. At the same time, the vibration of the abutment plays an important role in the safety of the overall bridge structure, and the abutment height of the bridge should be controlled within 40M. By optimizing the construction schedule of beams and slabs, the contract period can be shortened by up to 19 days, and the expected cost can be reduced by 760,000 yuan. The research results accumulate methods for applying BIM technology in the installation and construction stages of railway bridge beams and slabs. © 2024 Long Ke et al., published by Sciendo.
引用
收藏
相关论文
共 50 条
  • [31] A technology-based approach to training needs analysis
    Grant, C
    Scott, T
    McTear, M
    INNOVATIONS IN EDUCATION AND TRAINING INTERNATIONAL, 1997, 34 (03): : 188 - 193
  • [32] Construction Project Cost Management Based on BIM Technology
    Yin, Yilin
    Qian, Kun
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2147 - 2152
  • [33] Hoisting and Installation Construction Technology for Main Cable Saddle of Nizhou Waterway Bridge of Second Humen Bridge
    虎门二桥坭洲水道桥主索鞍吊装施工技术
    2018, Wuhan Bridge Research Institute (48)
  • [34] BIM Technology in bridge engineering construction simulation and control application<bold> </bold>
    Li, Y.
    Wen, Y.
    Lian, P.
    LIFE-CYCLE CIVIL ENGINEERING: INNOVATION, THEORY AND PRACTICE, IALCCE 2020, 2021, : 695 - 699
  • [35] Durability Software Development of Concrete Bridge Based on BIM Technology
    Lin, Pengzhen
    Han, Wanghe
    Journal of Railway Engineering Society, 2021, 38 (03): : 80 - 85
  • [36] Research on collaborative construction management of construction project based on BIM technology
    Zhan C.
    Fu C.
    Wu X.
    International Journal of Critical Infrastructures, 2023, 19 (01) : 79 - 93
  • [37] Sliding technology in bridge construction
    Beier, Hans-Jorg
    Bautechnik, 2000, 77 (10) : 725 - 730
  • [38] Formwork technology in Bridge construction
    不详
    BAUINGENIEUR, 2011, 86 : A9 - A10
  • [39] Preliminary Study on Comparison of Knowledge-Based and Technology-Based BIM Research on Infrastructure
    Bu, Shanshan
    Xu, Sheng
    Huang, Zebin
    CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 291 - 298
  • [40] Safety BIM intelligent modeling analysis of prestressed concrete continuous girder bridge construction scene
    Li, Tao
    Cong, Bori
    Yan, Maowang
    Li, Qingying
    Zhu, Xinyuan
    BRIDGE STRUCTURES, 2023, 19 (1-2) : 31 - 39