Hoisting and Installation Construction Technology for Main Cable Saddle of Nizhou Waterway Bridge of Second Humen Bridge

被引:0
|
作者
虎门二桥坭洲水道桥主索鞍吊装施工技术
机构
[1] Tong, Jun-Hao
[2] Zhu, Chao
[3] Dai, Xi-Hua
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The Nizhou Waterway Bridge of the Second Humen Bridge is an asymmetrical double-tower steel box girder suspension bridge with the main span of 1 688 m. The bridge consists of four main cable saddles, and the main cable saddles have a structure of cast welding that consists of two semi-saddles locked by high-strength bolts. The semi-saddles with the weight of 125 t are installed in the main saddle chamber at the top of a 256.4 m-high tower. The main cable saddles are hoisted by means of transfer platform on the top of bridge pylon cap + support by portal frame on pylon top + vertical hoist by a hydraulic jack with continuous lifting + longitudinal translation by transporter. During the construction, the grid reaction frame is hoisted by a hoisting system on the tower top, and concrete grout is poured into the grid reaction frame after being precisely positioned; then the upper and lower supporting plates are hoisted by the hoisting system on the tower top; finally, two semi-saddles are hoisted to the top of the tower by the hoisting system on the tower top and joined together by the high-strength bolts. During the installation of the superstructure of the main bridge, according to the pre-deflection monitoring instructions, the main saddles are gradually pushed in place by two 1 000 t jacks, thus final positioning and installation of the main saddles are completed. © 2018, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
相关论文
共 50 条
  • [1] Study on Longitudinal Constraint System of Nizhou Waterway Bridge of Second Humen Bridge
    Zhang, Xin-Min
    Xu, Yuan-Qing
    Lu, Li-Tao
    Li, Chong
    Bridge Construction, 2019, 49 (02) : 7 - 12
  • [2] Construction monitoring techniques for foundation pit of west anchorage of Nizhou waterway bridge of second Humen Birdge
    Zhu, Zhi-Bao (248941928@qq.com), 1600, Wuhan Bridge Research Institute (46):
  • [3] Design and construction of the Second Humen Bridge, China
    Wang, Xiaoming
    Fei, Pengbo
    Zhang, Xinmin
    Dong, You
    Melchy, Okandze Danny
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (04) : 161 - 166
  • [4] Construction Control Technology of Cable Hoisting System for the Arch Rib of Steel Box Bridge
    Wang, Yu
    Wei, Yanhong
    Hu, Guifen
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1403 - +
  • [5] CABLE HOISTING SYSTEM DESIGN FOR THE REPLACEMENT CONSTRUCTION OF CHAOYANG BRIDGE IN CHONGQING
    Feng, Yutao
    SUSTAINABLE ARCH BRIDGES, 2011, 2011, : 211 - 217
  • [6] Construction and control technology of the main bridge superstructure of Sutong Bridge
    Zhang Hong1
    2.CCCC-Second Harbour Engineering Company Limited
    EngineeringSciences, 2009, 7 (01) : 76 - 82
  • [7] Calculating Method of Arch Rib Installation Alignment of Large Span Cable Hoisting Arch Bridge
    Xiong Shaohui
    Chen Wei
    Wang Feng
    INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
  • [8] Study on the Long-span Cable-stayed Bridge Composite Beam Hoisting Construction Technology in China
    Li, Xinxing
    2015 2nd International Conference on Education and Education Research (EER 2015), Pt 3, 2015, 7 : 141 - 146
  • [9] Calculation method of main cable saddle of suspension bridge based on energy method
    Luan, Juan
    Hao, Xianwu
    Duan, Ruifang
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY (ICREET 2016), 2017, 112 : 509 - 513
  • [10] Main cable construction techniques of the Shantou Bay suspension bridge
    Wu, Qingfa
    Shi, Guobin
    Zhang, Wenzhong
    Hu, Liping
    Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 1999, 27 (11): : 75 - 82