Analysis on temporary connection mode of the large-span steel truss girder suspension bridge

被引:0
|
作者
Zhang, Haishun [1 ,2 ]
机构
[1] China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin,300300, China
[2] Tianjin University, Tianjin,300072, China
关键词
Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
During the construction of large-span steel truss girder suspension bridge, the temporary connection between steel truss girder segments has great influences on its construction. Different connection ways may directly affect the real-time and the bridge-completion internal force distributions of truss structure. With the Yangsigang Yangtze river highway bridge project taken as an example, three connection ways, including the gradually hinged method, gradually rigid-connecting method and timely hinged method, were compared and analyzed. The parameters or variables for comparison were the forces, cable force, etc. in steel truss girder member and temporary connection. The research conclusions indicate that, the gradually rigid-connecting method is infeasible because it can't ensure the structural safety, while the gradually hinged method and the timely hinged method can guarantee the structural safety. For the timely hinged method, the work difficulty may be increased as the simulation calculations and the field monitoring analysis are often combined for determining the hinging moment of steel truss girder, and the whole rigidity and stability of structure with the temporary connection measures of the lower chord are better compared to the gradually hinged method. In addition, counterweight was increased appropriately in the girder erection process for making the main cable and girder close to the curve shape of bridge-completion and reducing the forces of the temporary connection. Based on the research of timely hinged method, the timely hinged method without counterweight, the timely hinged method with equal counterweight and the timely hinged method with partial counterweight were compared for analyzing the effects of counterweight on steel truss girder. The research conclusions show that when the timely hinged method with partial counterweight is used, the indicators of truss girder and suspension cable are appropriate. Compared to the timely hinged method without counterweight, the timely hinged method with partial counterweight can close the lower chord into the hinged state in advance, enhancing the stiffness and stability of main girder structure. Compared to the timely hinged method with equal counterweight, the cable force of the timely hinged method with partial counterweight meet the requirements on safety factor, implying that it is an optimal way of temporary connection. © 2020, Editorial Office of China Civil Engineering Journal. All right reserved.
引用
收藏
页码:98 / 105
相关论文
共 50 条
  • [41] Seismic Response of a Large-Span Steel Truss Arch Bridge under Nonuniform Near-Fault Ground Motions
    Liu, Zhen
    Ma, Xingliang
    Lv, Junlin
    BUILDINGS, 2024, 14 (08)
  • [42] On Predicting the Ultimate Capacity of a Large-Span Soil–Steel Composite Bridge
    Amer Wadi
    Lars Pettersson
    Raid Karoumi
    International Journal of Geosynthetics and Ground Engineering, 2020, 6
  • [43] ANALYSIS ON NON-UNIFORM TEMPERATURE FIELD OF LARGE-SPAN STEEL TRUSS STRUCTURE WITH INCLINED LEG
    Wang J.-T.
    Liu Y.-F.
    Fan J.-S.
    Zhou M.
    Nie J.-G.
    Qiang A.-P.
    Zhou Z.-F.
    Gongcheng Lixue/Engineering Mechanics, 2024, 41 (01): : 208 - 218
  • [44] Reliability analysis of non-stationary buffeting of large-span bridge girder under a strong wind action
    Sun B.
    Ye Z.
    Ruan W.
    Zhang X.
    Yang M.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (07): : 144 - 154
  • [45] Analysis on Lifting and Welding Opportunity of Steel Box Girder of Double Tower Single Span Suspension Bridge
    Xu, Hanzheng
    Liu, Cheng
    Wang, Chao
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 361 - 365
  • [46] Study on Dynamic Test of a Large Span Steel Truss Pedestrian Bridge
    Li, Maoqi
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 769 - 775
  • [47] Construction Method of Low Temperature Welding for Large-Span Steel Truss Beam Structure
    Duan, Wen-zhong
    Li, Lin
    Han, Jian-ping
    Zhou, Jun
    Xiang, Chang-sheng
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 2025 - +
  • [48] Study on Seismic Isolation of Long Span Double Deck Steel Truss Continuous Girder Bridge
    Chen, Yongjian
    Sun, Honglie
    Feng, Zhenfa
    APPLIED SCIENCES-BASEL, 2022, 12 (05):
  • [49] VIV control of a large-span dual-layer steel truss beam bridge for highway and railway dual-purpose
    Chen T.
    Ma C.
    Duan Q.
    Xiang H.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (05): : 12 - 19
  • [50] Design of Steel Truss Girder of Main Bridge of Niutianyang Bridge
    Liu Q.
    Yang Z.
    Wang L.
    Bridge Construction, 2023, 53 (02) : 98 - 104