Analysis on temporary connection mode of the large-span steel truss girder suspension bridge

被引:0
|
作者
Zhang, Haishun [1 ,2 ]
机构
[1] China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin,300300, China
[2] Tianjin University, Tianjin,300072, China
关键词
Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
During the construction of large-span steel truss girder suspension bridge, the temporary connection between steel truss girder segments has great influences on its construction. Different connection ways may directly affect the real-time and the bridge-completion internal force distributions of truss structure. With the Yangsigang Yangtze river highway bridge project taken as an example, three connection ways, including the gradually hinged method, gradually rigid-connecting method and timely hinged method, were compared and analyzed. The parameters or variables for comparison were the forces, cable force, etc. in steel truss girder member and temporary connection. The research conclusions indicate that, the gradually rigid-connecting method is infeasible because it can't ensure the structural safety, while the gradually hinged method and the timely hinged method can guarantee the structural safety. For the timely hinged method, the work difficulty may be increased as the simulation calculations and the field monitoring analysis are often combined for determining the hinging moment of steel truss girder, and the whole rigidity and stability of structure with the temporary connection measures of the lower chord are better compared to the gradually hinged method. In addition, counterweight was increased appropriately in the girder erection process for making the main cable and girder close to the curve shape of bridge-completion and reducing the forces of the temporary connection. Based on the research of timely hinged method, the timely hinged method without counterweight, the timely hinged method with equal counterweight and the timely hinged method with partial counterweight were compared for analyzing the effects of counterweight on steel truss girder. The research conclusions show that when the timely hinged method with partial counterweight is used, the indicators of truss girder and suspension cable are appropriate. Compared to the timely hinged method without counterweight, the timely hinged method with partial counterweight can close the lower chord into the hinged state in advance, enhancing the stiffness and stability of main girder structure. Compared to the timely hinged method with equal counterweight, the cable force of the timely hinged method with partial counterweight meet the requirements on safety factor, implying that it is an optimal way of temporary connection. © 2020, Editorial Office of China Civil Engineering Journal. All right reserved.
引用
收藏
页码:98 / 105
相关论文
共 50 条
  • [11] Analysis of suspension cable force of large-span steel tube concrete tied arch bridge
    Wang X.
    Wang X.
    Liang X.
    Zhou M.
    Du Y.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (17): : 306 - 313
  • [12] Fatigue Analysis of Steel Box Stiffening Girders for Large-span Suspension Bridge in its Lifetime
    Zeng, Y.
    Tan, H.
    Li, X.
    Xiang, Z.
    Yu, F.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1173 - 1177
  • [13] Flutter suppression of long-span suspension bridge with truss girder
    Wang, Kai
    Liao, Haili
    Li, Mingshui
    WIND AND STRUCTURES, 2016, 23 (05) : 405 - 420
  • [14] Buffeting Time-Domain Analysis of Long-Span and Slender Suspension Bridge with a Steel Truss Stiffened Girder
    Jiang, Xiujuan
    Wu, Junyan
    Liu, Jianxin
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2183 - +
  • [15] Comparative Research of Extra-large-span Cable-stayed Bridge with Steel Truss Girder and Steel Box Girder
    Tan, Manjiang
    Bai, Zhizhou
    Chen, Dewei
    2015 INTERNATIONAL CONFERENCE ON ENERGY, MATERIALS AND MANUFACTURING ENGINEERING (EMME 2015), 2015, 25
  • [16] Progressive collapse analysis and mechanism study for large-span steel truss structures
    Jiang, Xiao-Feng
    Chen, Yi-Yi
    Gongcheng Lixue/Engineering Mechanics, 2010, 27 (01): : 76 - 83
  • [17] Redundancy Analysis of Steel Truss Girder Bridge
    Bhaganagare, Prashant
    TECHNO-SOCIETAL 2018: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ADVANCED TECHNOLOGIES FOR SOCIETAL APPLICATIONS - VOL 1, 2020, : 921 - 931
  • [18] Design of Truss Stiffening Girder of a Long-Span Railway Suspension Bridge
    Xu, Wei
    Li, Song-Lin
    Hu, Wen-Jun
    Bridge Construction, 2021, 51 (02): : 10 - 17
  • [19] Flutter Performance Study of Steel Truss Girder Suspension Bridge Under Large Angles of Attack
    Wang Y.
    Wang B.
    Li Y.
    Chen X.
    Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2019, 27 (02): : 384 - 390