Analysis on temporary connection mode of the large-span steel truss girder suspension bridge

被引:0
|
作者
Zhang, Haishun [1 ,2 ]
机构
[1] China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin,300300, China
[2] Tianjin University, Tianjin,300072, China
关键词
Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
During the construction of large-span steel truss girder suspension bridge, the temporary connection between steel truss girder segments has great influences on its construction. Different connection ways may directly affect the real-time and the bridge-completion internal force distributions of truss structure. With the Yangsigang Yangtze river highway bridge project taken as an example, three connection ways, including the gradually hinged method, gradually rigid-connecting method and timely hinged method, were compared and analyzed. The parameters or variables for comparison were the forces, cable force, etc. in steel truss girder member and temporary connection. The research conclusions indicate that, the gradually rigid-connecting method is infeasible because it can't ensure the structural safety, while the gradually hinged method and the timely hinged method can guarantee the structural safety. For the timely hinged method, the work difficulty may be increased as the simulation calculations and the field monitoring analysis are often combined for determining the hinging moment of steel truss girder, and the whole rigidity and stability of structure with the temporary connection measures of the lower chord are better compared to the gradually hinged method. In addition, counterweight was increased appropriately in the girder erection process for making the main cable and girder close to the curve shape of bridge-completion and reducing the forces of the temporary connection. Based on the research of timely hinged method, the timely hinged method without counterweight, the timely hinged method with equal counterweight and the timely hinged method with partial counterweight were compared for analyzing the effects of counterweight on steel truss girder. The research conclusions show that when the timely hinged method with partial counterweight is used, the indicators of truss girder and suspension cable are appropriate. Compared to the timely hinged method without counterweight, the timely hinged method with partial counterweight can close the lower chord into the hinged state in advance, enhancing the stiffness and stability of main girder structure. Compared to the timely hinged method with equal counterweight, the cable force of the timely hinged method with partial counterweight meet the requirements on safety factor, implying that it is an optimal way of temporary connection. © 2020, Editorial Office of China Civil Engineering Journal. All right reserved.
引用
收藏
页码:98 / 105
相关论文
共 50 条
  • [21] Research on the construction crack resistance of large-span box girder bridge
    Wang, Jian-Qun, 1600, Editorial Department of Journal of Railway Engineering Society, China (33):
  • [22] Testing and Analysis on Force Transmission Mechanism of Steel-Concrete Joint of Large-span Hybrid Continuous Girder Bridge
    Yuan H.
    Huang Z.
    Wu Q.
    Lin Z.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 44 - 56
  • [23] Research on the load transfer performance of large-span steel truss cable-stayed bridge structures
    Gu, Lixiong
    Liu, Cong
    Ma, Niujing
    Ji, Jianyi
    ADVANCES IN MECHANICAL ENGINEERING, 2024, 16 (10)
  • [25] Stability Analysis on Large-span Steel Tubular Truss Based on Finite Element Simulation
    Bi, Jianjun
    2016 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA 2016), 2016, : 237 - 240
  • [26] Analysis of Dynamic Reliability on Large-span Bridge
    Guo, Ying
    Zhu, Guangyi
    Cong, Shumin
    SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, PTS 1-4, 2013, 303-306 : 2880 - 2884
  • [27] Analysis of Global Static and Dynamic Property of Long-Span Steel Truss Girder Rail-cum-Road Suspension Bridge
    大跨度公铁两用钢桁梁悬索桥整体静动力特性分析
    Liu, Jia-Bing (bbliujiabing@126.com), 1600, Wuhan Bridge Research Institute (50): : 23 - 28
  • [28] Wind-Resistant Control Research for the Main Girder of Large-Span Bridge
    Liu, Ronggui
    Guo, Qing
    Cai, Dongsheng
    Chen, Bei
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2176 - 2182
  • [29] Research of Intelligent Hoisting System for Steel Truss Girder of Long-span Railway Suspension Bridge in Mountain Area
    Mao, Weiqi
    Li, Xiaozhen
    Wang, Xiang
    Journal of Railway Engineering Society, 2024, 41 (03) : 52 - 58
  • [30] Analysis of large-span steel concrete railway arch bridge suspender tension
    Xu, Jialin
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1259 - 1263