Study on the Suitability of Advanced Geological Prediction Methods for TBM Tunnel Construction

被引:0
|
作者
Fu, Wei [1 ]
Zhang, Wenzhong [1 ]
Liu, Zhengyu [2 ]
Zhao, Wen [1 ]
Lu, Song [3 ]
Chen, Xingqiang [1 ]
Wang, Huajiang [1 ]
Cai, Shaofeng [4 ]
机构
[1] China Railway First Survey and Design Institute Group Co. Ltd, Shaanxi, Xi'an,710043, China
[2] Shandong University, Shandong, Jinan,250100, China
[3] China Railway Southwest Research Institute Co. Ltd, Sichuan, Chengdu,500643, China
[4] The General Engineering Survey Institute of Railways of Gansu Co. Ltd, Gansu, Lanzhou,730100, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: In the TBM construction environment, accurate identification of adverse geological bodies in the front tunnel face can effectively avoid geological problems such as machine jam, water and mud inrush. However, due to the extremely narrow space and complex electromagnetic interference of TBM construction, traditional advanced geological prediction methods are difficult to effectively implemented. Based on extensive research, this paper conducted experimental studies on the advantages, disadvantages, and accuracy of different advanced geological prediction methods for TBM construction. The research results have broken through the limitations of traditional single prediction methods and established a comprehensive advanced geological prediction system for TBM construction in extremely complex geological environments. Moreover, this study proposed solutions for advanced geological prediction in complex geological environments such as wide faults and strong water abundance. Research conclusions: (1) The experimental results of groundwater detection under TBM construction conditions show that the induced polarization detection method is more accurate in predicting groundwater bodies. Moreover, this method has good suitability for TBM construction and can effectively solve the problem of groundwater detection in complex hydrogeological environment. (2) The suitability study of elastic wave reflection prediction methods in TBM construction environment shows that HSP and 3D seismic (SAP) methods are highly sensitive to unfavorable geological bodies such as fault fracture zones in extremely complex geological environments. Moreover, these two methods have less interference with tunnel construction and are more suitable for TBM construction environment. (3) The research results of this paper can be used to guide the advance geological prediction design and construction of TBM construction tunnel, and further reduce the construction risk. © 2023 Editorial Department of Journal of Railway Engineering Society. All rights reserved.
引用
收藏
页码:81 / 85
相关论文
共 50 条
  • [1] The application of geological advanced prediction in tunnel construction
    Lu Youzhong
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [2] State of art and trends of advanced geological prediction in tunnel construction
    Li, S. (lishucai@sdu.edu.cn), 1600, Academia Sinica (33):
  • [3] A Study of Tunnel Construction Environment Based on the TBM and Improved Methods
    Wu Qiujun
    Li Ke
    Wang Mingnian
    Chao Feng
    PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2016), 2016, 99 : 149 - 153
  • [4] Study of geological prediction implementation method in tunnel construction
    Xue Yi-guo
    Li Shu-cai
    Su Mao-xin
    Li Shu-chen
    Zhang Qing-song
    Zhao Yan
    Li Wei-teng
    ROCK AND SOIL MECHANICS, 2011, 32 (08) : 2416 - 2422
  • [5] Comprehensive Advanced Geological Prediction Method Based on Multi⁃source Information for Double Shield TBM Construction Tunnel and Its Application
    Yang J.
    Yang F.
    Fang J.
    Nie L.
    Yan C.
    Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2023, 31 (06): : 1571 - 1589
  • [6] CONSTRUCTION METHODS AND APPLICATION OF TBM IN SHENGLI TUNNEL OF TIANSHAN MOUNTAIN UNDER POOR GEOLOGICAL CONDITIONS
    Zhao, Zhenping
    Chen, Jianxun
    Geng, Qi
    Li, Dong
    Huang, Dengxia
    Luo, Yanbin
    Liu, Weiwei
    Mu, Shaoping
    Peter Anesu, Kanhenga
    Wu, Teligen
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2024, 33 (02): : 168 - 180
  • [7] Study on the Methods of Advanced Geological Prediction of Double-arch Highway Tunnel in Karst Area
    He, Chongxiong
    Lin, Chunjiao
    Yao, Xiao
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1275 - +
  • [8] Application of TSP and Advanced Drilling Geological Prediction Technology in Construction of Qiyueshan Tunnel
    Rao, Xinping
    Yi, Wa
    Sun, Hui
    Zhang, Zhenhua
    ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 493 - 499
  • [9] Research on reliability of advanced geological forecasting for tunnel construction
    Ye, Ying
    Journal of Railway Engineering Society, 2013, 30 (01) : 66 - 71
  • [10] TBM Advanced Geological Prediction via Ellipsoidal Positioning Velocity Analysis
    Gao, Zhen
    Rong, Xin
    Wang, Wei
    Huang, Bin
    Liu, Junqiang
    BUILDINGS, 2024, 14 (10)