Study on the Suitability of Advanced Geological Prediction Methods for TBM Tunnel Construction

被引:0
|
作者
Fu, Wei [1 ]
Zhang, Wenzhong [1 ]
Liu, Zhengyu [2 ]
Zhao, Wen [1 ]
Lu, Song [3 ]
Chen, Xingqiang [1 ]
Wang, Huajiang [1 ]
Cai, Shaofeng [4 ]
机构
[1] China Railway First Survey and Design Institute Group Co. Ltd, Shaanxi, Xi'an,710043, China
[2] Shandong University, Shandong, Jinan,250100, China
[3] China Railway Southwest Research Institute Co. Ltd, Sichuan, Chengdu,500643, China
[4] The General Engineering Survey Institute of Railways of Gansu Co. Ltd, Gansu, Lanzhou,730100, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: In the TBM construction environment, accurate identification of adverse geological bodies in the front tunnel face can effectively avoid geological problems such as machine jam, water and mud inrush. However, due to the extremely narrow space and complex electromagnetic interference of TBM construction, traditional advanced geological prediction methods are difficult to effectively implemented. Based on extensive research, this paper conducted experimental studies on the advantages, disadvantages, and accuracy of different advanced geological prediction methods for TBM construction. The research results have broken through the limitations of traditional single prediction methods and established a comprehensive advanced geological prediction system for TBM construction in extremely complex geological environments. Moreover, this study proposed solutions for advanced geological prediction in complex geological environments such as wide faults and strong water abundance. Research conclusions: (1) The experimental results of groundwater detection under TBM construction conditions show that the induced polarization detection method is more accurate in predicting groundwater bodies. Moreover, this method has good suitability for TBM construction and can effectively solve the problem of groundwater detection in complex hydrogeological environment. (2) The suitability study of elastic wave reflection prediction methods in TBM construction environment shows that HSP and 3D seismic (SAP) methods are highly sensitive to unfavorable geological bodies such as fault fracture zones in extremely complex geological environments. Moreover, these two methods have less interference with tunnel construction and are more suitable for TBM construction environment. (3) The research results of this paper can be used to guide the advance geological prediction design and construction of TBM construction tunnel, and further reduce the construction risk. © 2023 Editorial Department of Journal of Railway Engineering Society. All rights reserved.
引用
收藏
页码:81 / 85
相关论文
共 50 条
  • [31] Study on the application of infrared water detector in the geological prediction of tunnel
    Liu Hong-mei
    2017 2ND INTERNATIONAL CONFERENCE ON MECHATRONICS AND INFORMATION TECHNOLOGY (ICMIT 2017), 2017, : 292 - 295
  • [32] Application of Advanced Geology Prediction Methods in Tunnel Engineering Geology- Taking the Geological Condition of the Huang Qi Highway Tunnel of Anhui Province as an Example
    Zu, Xiaofang
    Liu, Jiangping
    2012 THIRD INTERNATIONAL CONFERENCE ON THEORETICAL AND MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE (ICTMF 2012), 2013, 38 : 646 - 652
  • [33] An Application of Comprehensive Geological Prediction Methods in a High-Speed Railway Tunnel
    Yin, Peng
    Yao, Ruiting
    Ji, Xiaolei
    ADVANCES IN CIVIL INFRASTRUCTURE ENGINEERING, PTS 1 AND 2, 2013, 639-640 : 279 - +
  • [34] Study on urban construction land optimization based on geological environment suitability evaluation
    Lu C.
    Shi L.
    Zhao X.
    Li W.
    Arabian Journal of Geosciences, 2021, 14 (7)
  • [35] Construction work of Yamba tunnel TBM test section
    Takagi, K
    Tsukada, M
    Watabe, Y
    Iizuka, H
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 545 - 549
  • [36] Dynamic reliability evaluation of TBM components in tunnel construction
    Xiong, Yue
    Lin, Peng
    Xu, Zhenhao
    Liu, Youbo
    GEOLOGICAL JOURNAL, 2024, 59 (09) : 2594 - 2608
  • [37] Design considerations for construction of the Qinling Tunnel using TBM
    Liu, P
    Liang, WH
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2000, 15 (02) : 139 - 146
  • [38] Simulation and optimization of whole TBM tunnel construction process
    College of Water and Electrics, Xi'an University of Technology, Xi'an 710048, China
    不详
    Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban), 2007, 6 (868-870):
  • [39] Construction schedules simulation and prediction of water conveyance tunnel based on karst geological condition
    Bi Lei
    Luo Jiaqian
    Tong Dawei
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1298 - +
  • [40] Study on application of TSP advanced forecast in tunnel construction
    Yang, Feng
    Li, Zhi-Hua
    Shi, Jian-Lin
    Journal of Railway Engineering Society, 2013, 30 (02) : 76 - 80